Laserfiche WebLink
Conditions for Approval for Tentative Parcel Map No 2007-04 <br />Tentative Parcel Map No. 2007-04 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below rior to <br />exercising the rights conferred by this approval. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the tentative parcel map. Failure to comply with each and every condition may <br />result in the revocation of the tentative parcel map. <br />A. Planning Division <br />1. Two copies of the recorded final parcel map shall be submitted each to the <br />Planning Division, Building Division and Public Works Agency within 10 <br />days of recordation. <br />2. The tentative parcel map, final map and all improvements required to be <br />made or installed by the subdivider shall be in accordance with the <br />requirements and design standards and specifications of the City of Santa <br />Ana and the requirements of the State Subdivision Map Act. <br />3. After project occupancy, landscaping is to be maintained in accordance <br />with the landscape plan approved for the project. This shall include the <br />minimum levels of plant materials shown on the landscape plan and <br />installed at the time of occupancy. <br />4. A fencing plan showing the location of all project fencing and the materials to <br />be used must be submitted to the Planning Division prior to submittal into <br />building plan check. <br />5. All real estate signage must be removed from the site within one year from <br />the date of installation. An extension of time may be granted as determined <br />by the Planning Manager. <br />6. The final map must be approved and recorded prior to issuance of building <br />permits. <br />7. Development within the area of the map is subject to development and <br />permit fees in effect at the time of permit issuance. <br />Exhibit A <br />Page 1 of 2 <br />Resolution No. 2007-10 <br />Page 5 of 6 <br />32A-17 <br />