My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CA DEPT TRANSPORTATION (3) - 2008
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
CA DEPT TRANSPORTATION (3) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:15:46 PM
Creation date
1/22/2008 11:22:09 AM
Metadata
Fields
Template:
Contracts
Company Name
CA, STATE, TRANSPORTATION
Contract #
A-2008-010
Agency
PUBLIC WORKS
Council Approval Date
1/7/2008
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT II <br /> <br />Santa Ana Depot Aesthetic Improvements <br /> <br />~:.'-:7~"':'" ;:'~_-. <br /> <br />Scope of Work <br /> <br />The scope of this project includes the aesthetic upgrade of various components to the <br />Santa Ana Depot. Improvements including repair of the stucco in various locations <br />around the Depot building, along the colonnades and pilasters of the perimeter wrought <br />iron fencing along Santa Ana Blvd. and Santiago St. Another targeted improvement <br />would be the replacement of the balustrade of the staircase on the south side of the <br />courtyard as well as along the southern viewing deck at the top of this staircase. <br />Installation of new paladian windows along the northern and eastern elevations of the <br />event room on the north side of the building are also proposed. <br /> <br />Estimate <br /> <br /> <br />Schedule <br /> <br />ID Task Name <br /> <br /> <br />1.. <br /> <br />Au <br />1 Balu~~de _~pla~_I11_':.,:t_________!-_~ 10 ~ays <br />2 Design I 35 days <br />3 --a;nstructi~-;;----_.--r- 30 days' <br />__M"__~_-+--____ <br />4 <br />5 <br />6 <br />7 <br /> <br />Building Painting & Stucco Repair ! 13.4 days <br />---.--4..-- <br />Design 1 35 days <br />-. - Construction --- - .... . _no_____ ! - - 54 d~ys <br /> <br />I- <br />I <br /> <br />- <br /> <br />.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.