Laserfiche WebLink
<br />Santa Ana Depot Aesthetic Improvements <br /> <br />Scope of Work <br /> <br />The scope of this project includes the aesthetic upgrade of various components to the <br />Santa Ana Depot. Improvements including repair of the stucco in various locations <br />around the Depot building, along the colonnades and pilasters of the perimeter wrought <br />iron fencing along Santa Ana Blvd. and Santiago St. Another targeted improvement <br />would be the replacement of the balustrade of the staircase on the south side of the <br />courtyard as well as along the southern viewing deck at the top of this staircase. <br />Installation of new paladian windows along the northern and eastern elevations of the <br />event room on the north side of the building are also proposed. <br /> <br />Estimate <br /> <br /> <br />Schedule <br /> <br />1 Balustrade Replacement <br />2 Design <br />3 Cons lruction <br />4 <br />5 Building Painting & Stucco Repair <br />6 Design <br />Construction <br /> <br /> <br />1.. <br /> <br />I ID Task Narre <br /> <br />134 days <br />35 days <br />54 days <br /> <br />- <br /> <br />- <br /> <br />, , <br />-".. --,-----------_._''''--,~'.._--,...._...._,.- <br /> <br />.. <br /> <br />