Laserfiche WebLink
<br />" <br /> <br />Agreement No. 75A0242 <br /> <br />Attachment I <br /> <br />Project Description <br /> <br />The proposed project is located at 1000 East Santa Ana Boulevard at the Santa Ana <br />Regional Transit Center (SARTC) in the City of Santa Ana. The project entails <br />construction of a block wall and the installation of color imprinted art panels onto the <br />wall. The block wall has two main functions: 1) to serve as a visual barrier to the Orange <br />County maintenance facility for train patrons and others using the station facility, and 2) <br />serve as the mounting wall for the art panels. The wall will be 1000 feet long, and 10 feet <br />high. The images to be imprinted on the panels will be selected by a local arts <br />committee. <br /> <br />Initially, this project was to be constructed in tandem with the platform reconstruction as <br />part of the Pedestrian Bridge project at the SARTC, A very specific time window was <br />built into the overall project schedule for this coordinated effort to occur, but events <br />precluded the Art Wall from being constructed during this timefrarne. <br /> <br />The Art Wall will now be constructed upon completion ofthe Pedestrian Bridge (July <br />2006). This post-platform construction of the Art Wall will necessitate working within a <br />limited physical space (8' to 10'), and will require the use of lighter duty equipment. <br />This will add both time and cost to the original budget of the project. <br /> <br />