Laserfiche WebLink
EXHIBIT B-2 <br />2008 Fee Schedule <br />PERSONNEL CHARGES — The charge for all time required for the performance of the Scope of <br />Services, including office, field and travel time, will be billed at the hourly rate according to the labor <br />classifications set forth below: <br />Labor Classification Hourly Rate <br />Staff Geologist, Engineer, Scientist <br />$85 <br />Sr Staff Geologist, Engineer, Scientist <br />$95 <br />Project Manager, Geologist, Engineer -1 <br />$110 <br />Project Manager, Geologist, Engineer — II <br />$120 <br />Sr Project Manager, Geologist, Engineer -1 <br />$140 <br />Sr Project Manager, Geologist, Engineer - II <br />$165 <br />Principal Geologist, Engineer <br />$175 <br />Principal <br />$195 <br />Project Assistant <br />$65 <br />Technician <br />$75 <br />Drafter <br />$80 <br />Sr Technician <br />$85 <br />Compliance Inspector <br />$85 <br />GIS Analyst <br />$85 <br />GIS, Database Specialist <br />$110 <br />Construction Technician <br />$60 <br />Construction Field Supervisor <br />$70 <br />Construction Manager <br />$80 <br />Sr Construction Manager <br />$110 <br />Emergency response and client requested work during non-standard business hours will be charged at a <br />rate of 1.25 times the standard hourly rate. <br />When EEC Staff appear as expert witnesses at court trials, mediation, arbitration hearings and <br />depositions, their time will be charged at 2.0 times the standard rate. All time spent preparing for such <br />trials, hearings, and depositions, will be charged at the standard hourly rate. <br />TRAVEL. Field vehicles used on project assignments will be charged at $50 per day. The mileage charge <br />will be billed by the current rate established by the Internal Revenue Service plus mark up. Per Diem is <br />billed at a unit cost of $40 per day. Lodging and Per Diem is billed at $175 per day. <br />FIELD EQUIPMENT. Field Equipment is billed at standard unit costs. Rate schedules are available upon <br />request. <br />SUBCONTRACTORS AND REIMBURSABLES. The costs of subcontractors, materials, equipment rental <br />and costs incurred will be charged at cost plus 15%. <br />OTHER PROJECT CHARGES. The cost of additional report reproduction and special project accounting <br />will be billed as appropriate. Plotting plans are charged by size, black and white or color, and by the <br />number of copies supplied. <br />SHIPPING AND POSTAGE. Shipping charges include couriers and the postage necessary will be <br />charged at cost plus markup. <br />INTEREST CHARGES. Interest on late payments will be charged at the rate of 1.5% per month <br />This Fee Schedule is adjusted each subsequent year to reflect the ecvnomlc changes torthe new year. The new schedule will apply to <br />existing and new assignments. <br />