Laserfiche WebLink
Bella Terra Residential Community and Temple Project <br />TASK 3 INITIAL STUDYIMITIGATED NEGATIVE DECLARATION <br />Subtask 3.1 Administrative Draft Initiat Study/Mitigated Negative Declaration <br />Psomas will prepare an Administrative Draft ISIMND usingthe CEQA Environmental Checklist <br />Form (Appendix G). In compliance with Section 15063(d) of the State CEQA Guidelines, the IS will <br />contain the location of the Project site; a discussion of the environmental setting; a description of <br />the Project; identification of the Project's potential environmental effects; and a discussion of any <br />required mitigation. <br />The discussion of the environmental settingwill be based on a review of existing information; <br />studies provided bythe Applicant (if available) and analyses prepared by Psomas; review of aerial <br />photographs; and a site visit. The environmental analysis will include an explanation for all <br />checklist responses to provide an understanding of how the IS/MND conclusions were reached. <br />Project -specific mitigation will be developed for impacts that are determined to be potentially <br />significant. — — --— — <br />The findings of the technical analysis conducted by Psomas and included above in Subtask 2.1, will <br />be incorporated in the appropriate sections of the Administrative Draft IS/MND and the supporting <br />data will be included as appendices. All other topics in the Administrative Draft IS/MND (i.e., <br />Aesthetics, Agricultural and Forestry Resources, Biological Resources, Land Use Planning, Mineral <br />Resources, Population and Housing, Public Services, Recreation, Utilities and Service Systems, <br />and Wildfire) will be analyzed and discussed qualitatively. It is noted that if a Phase I ESA is not <br />prepared by the Applicant and not available for use in the Administrative Draft IS/MND, Psomas will <br />contract with Environmental Data Resources (EDR) to complete a radius search of hazardous <br />materials databases. Psomas will summarize the findings of the report in the Hazards and <br />Hazardous Materials section of the IS/MND and include the report as an appendix. <br />Upon completion, the Administrative Draft ISIMND will be submitted electronically to the City for <br />review and comment. <br />Subtask 3.1 Deliverables <br />6 Electronic Copy of Administrative Draft ]S/MND <br />Subtask3.2 Screencheck Draft and Draft Initial StudyLMitigated Negative Declaration <br />Following review of the Administrative Draft IS/MND by the City, Psomas will revise the document <br />to incorporate comments received and prepare the Screencheck Draft ISIMND. This task <br />anticipates that comments received wilt require only one set of revisions. Psomas will then <br />resubmit the document to the City for final approval prior to distribution. <br />Since the proposed Project requires submittal to the State Clearinghouse (SCH), a 30-day public <br />review period is required. Psomas will submit the ISIMND, including the appendices, the Notice of <br />Intent (NOI), the Notice of Completion (NOC), and the State Clearinghouse (SCH) Summary Form <br />to the SCH via CEQA Submit. Psomas wilt file the NOI to adopt an MND and the NOC with the <br />County Clerk. A notice is also required to be published in local newspapers or, at a minimum, <br />posted atthe Project site. It is assumed that Psomas will prepare the notice, but the Applicant will <br />post it at the Project site and submit it to the newspaper for publication. <br />AAPropo9a1s%San[AnaWel1a TwWFlnall6o11n Torra_1BMND-022425.do A-6 Scope of Work <br />