My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, CITY OF (11)
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, CITY OF (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:39:32 AM
Creation date
3/27/2025 10:26:54 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA, CITY OF
Contract #
A-1989-021
Agency
Public Works
Expiration Date
1/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA DATE April 3,.1989 <br />AGRE.EMEI-ITF BETWEEN 'THE CITIES <br />OF SANTA ABTA AND COS -VA MESA FOR <br />SUNFILWER AVENUE RESURFACING AND <br />RECOMMENDED, ACTION <br />DATE OF COUNCIL ACTION APR 9Z 1989 <br />CLERK OF THE COUNCIL <br />1) Approve and authorize -the Mayor and Clerk of the Council -to P-xecu-(--e an <br />Agreement between the Cities of Santa Ana and Costa Mesa for the resurfacing <br />and reconstruction of a portion of Sunflower Avenue,- and, <br />2) Approve an Appropriation Adjus b-nent, No. 162 for $200, 000 from Account <br />No. 59-551--631 for the resurfacing and reconstruction of Sunflower Avenue. <br />EXECUTIVE SUMMARY <br />The City of Costa Mesa is planning to resurface and reconstruct Sunflower Avenue <br />from Bear Street to Bristol Street. The north half of Sunflower Avenue lies <br />within the City of Santa Ana. The City of Costa Mesa., acting as the lead <br />agency, has requested that the City of Santa Ana participate in the resurfacing <br />of this street segment. <br />The Participation Agreenent sets forth the terms and conditions of our efforts <br />with the City of Costa Mesa in the resurfacing and reconstruction of Sunflower <br />Avenue. The estimated construction cost of that portion of the resurfacing <br />project which lies in Santa Ana is approximately $172,945 or 44% of the total <br />project cost. The City of Santa Ana will also be assessed a proportionate Share <br />for preliminary design, .the preparation of plans and specifications, and con- <br />struction engineering. <br />An Appropriation Adjus-buent of $200,000 is requested to cover the cost of <br />design engineering, construction engineering, and construction. Funds are <br />available in Account No. 59-551-631. <br />
The URL can be used to link to this page
Your browser does not support the video tag.