My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, IRVINE, NEWPORT BEACH, & AUSTIN-FOUST
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, IRVINE, NEWPORT BEACH, & AUSTIN-FOUST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:40:35 AM
Creation date
3/27/2025 10:32:58 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA, IRVINE, NEWPORT BEACH, & AUSTIN-FOUST
Contract #
A-1992-062
Agency
Public Works
Expiration Date
1/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provide some general cost parameters for evaluating potential funding mechanisms. <br />4. Post-2010 Tralrc Forecasts <br />The traffic model used in the Five -City study has a Post-2010 version that can be prepared <br />for use without a major work effort. This model will be used for identifying peak hour intersection <br />volumes in a similar manner to that carried out for 1999. The peak hour forecast data will be utilized <br />to prepare intersection capacity utilization (ICU) values for this long-range time period. A <br />preliminary set of lane configurations will be prepared for each intersection to show the type of <br />improvements that may be needed: These configurations will be preliminary in nature, and will not <br />be subject to a detailed feasibility and cost analysis. <br />5, Final Report and Presentations <br />The results of the traffic analysis will, be written into a final report, and up to five <br />presentations will be given to summarize the findings. <br />COST ESTIMATE <br />The traffic model area includes the City of Tustin, although the short-range version of the <br />model will need to be set up to process intersections in Tustin. Assuming availability of traffic count <br />and land use data, this is estimated to cost around $3,000. The additional cost for carrying out the <br />above five work items with an expanded study area that includes intersections in Tustin is $6,000. <br />Table 1 summarizes the estimated costs for the scope of work described here. It includes the <br />City of Tustin as a participant in this next phase of the study. Additional costs for each city can be <br />summarized 'as follows: <br />Total work effort cost $49,000 <br />Less funds remaining $25,000 <br />Net Additional Cost $24,000 <br />Cost per City: <br />Tustin $9,000 <br />Others $3,750 <br />Four -City Traffic Study 3 Austin -Foust Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.