My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, CITY OF (12)
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, CITY OF (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:39:42 AM
Creation date
3/27/2025 10:45:56 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA, CITY OF
Contract #
A-1997-003
Agency
Public Works
Expiration Date
1/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/j <br />MREEMENT FOR REHABILITATION OFHARBOR BOULEVARD <br />FROM SUNFLOWER AVENUE TO MACARTHUR BOULEVARD <br />THIS AGREEMENT is made and entered into this day of 1996 by the CITY <br />OF SANTA AA (hereinafter "Santa Ana") and the CITY OF COSTA MESA (hereinafter <br />"Costa Mesa"). I <br />WITNESSETH <br />WHEREAS, Costa Mesa desires to resurface the pavement, and reconstruct existing damaged <br />concrete street improvements on sections of Harbor Boulevard from Wilson Street to MacArthur <br />Boulevard, construct storm drain improvements from Sunflower Avenue to Greenville Banning <br />Channel (South Coast Drive), and intersection improvements at Sunflower Avenue ' and Harbor <br />Boulevard (hereinafter, "THE PROJECT") in accordance with engineering studies indicating the <br />need for such improvements; and <br />WHEREAS, a portion of Harbor Boulevard needing new storm drain facilities, resurfacing, and <br />reconstruction located between Sunflower Avenue and MacArthur Boulevard lies partly within <br />the corporate limits of Santa Ana; and <br />WHEREAS, Costa Mesa and C.J. Segerstrom & Sons have entered into a contract with <br />CH2N4HILL and Norris-Repke, Inc., (hereinafter, "CONSULTANTS") to provide design <br />engineering and prepare plans and specifications for THE PROJECT, and <br />WHEREAS, the parties hereto desire to provide for the concurrent design engineering, <br />construction engineering, survey, and construction of that portion of Harbor Boulevard within <br />the corporate boundaries of both cities and desire to provide for the proportionate sharing of the <br />costs thereof. <br />NOW, THEREFORE, the parties hereto agree as follows: <br />1. Costa Mesa shall prepare the plans and specifications for THE PROJECT in <br />accordance with standard engineering practices. Santa Ana shall have a right of <br />approval of said plans and specifications as they relate to the portion of THE <br />PROJECT located within Santa Ana. <br />Costa Mesa shall advertise and award the construction contract for THE PROJECT in <br />accordance with state and local law. <br />3. Costa Mesa shall administer the constniction contract and shall supervise all work <br />performed. <br />Harbor Rehab Agreement I of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.