Laserfiche WebLink
8. To cover the cost associated with the installation of a SPPWC concrete collar for the slot drain <br /> connection per RFI #018. (PCO #012) <br /> AGREED COST: $1,957.81 <br /> TOTAL AGREED COST: $362,048.11 <br /> DEDUCTIVE CHANGE ORDER <br /> 1. Removal of Bid Item 77 to Install 30' Sports Lighting Pole (including post, footing, luminaires, <br /> excavation, and removals. (PCO #008). Sports lighting to be installed by others. <br /> AGREED COST: ($38,000) <br /> NET CONTRACT INCREASE: $324,048.11 <br /> Page 2 of 3 <br />