My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGION CONTRACTORS, INC. (BRISTOL-TOLLIVER STREET URBAN GREENING)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LEGION CONTRACTORS, INC. (BRISTOL-TOLLIVER STREET URBAN GREENING)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 3:06:36 PM
Creation date
4/3/2025 4:45:43 PM
Metadata
Fields
Template:
Contracts
Company Name
LEGION CONTRACTORS, INC. (BRISTOL-TOLLIVER STREET URBAN GREENING)
Contract #
P24-6600
Agency
Public Works
Council Approval Date
3/18/2025
Expiration Date
1/1/1900
Insurance Exp Date
5/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> �4 <br /> Project Number Project 24-6600—Bristol Tolliver Street Urban Greening Change Order Number 2 <br /> To Legion Contractors, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> JUSTIFICATION <br /> 1. To cover the cost associated with Bio-retention Pump Subgrade Preparation (PCO#013) <br /> AGREED COST: $9,957.79 <br /> 2. To cover the cost associated with Delta#6 plans to adjust elevations in the Hesperian alley. <br /> (PCO#014) <br /> AGREED COST: $11,977.66 <br /> 3. To cover the cost associated with South Wall Slope Paving & Footing. (PCO#015) <br /> AGREED COST; $12,223.05 <br /> 4. To cover the cost associated with painting the bottom of the western wall. (PCO#016) <br /> AGREED COST: $14,599.53 <br /> TOTAL AGREED COST: $48,768.03 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.