Laserfiche WebLink
<br />F ~~~~!~~~ <br /> <br />p. Provide weekly telephonic status reports. <br />q, Provide written certification upon successful installation. <br />Santa Ana shall: <br /> <br />a, Be available to address and answer questions that arise during the installation of the <br />baseline IQjCAD application software. <br /> <br />b. Provide requested information on record layouts and documents necessary to establish <br />interfaces with all local and remote systems and facilities at least twenty one (21) days <br />prior to scheduled interface work. <br /> <br />c. Provide and install all communications lines and equipment not provided by Positron as <br />deliverables according to the contract documents. <br /> <br />d. Ensure that necessary certifications, approvals and other related issues will be <br />completed by Santa Ana at least twenty one (21) calendar days prior to scheduled <br />interface work. <br /> <br />e. Provide all required liaison support with the agencies and vendors required to support <br />the interfaces. <br /> <br />f. Ensure that the necessary technical support is made available for installation, testing <br />and demonstration of the interfaces. <br /> <br />g. Approve for full payment any previously agreed upon computer equipment and third- <br />party software that has been delivered to Santa Ana. <br /> <br />h. Be available to address and answer questions that arise during the installation of the <br />baseline application software. <br /> <br />i. Assume responsibility for preparing Santa Ana-owned network, electrical and telephone <br />connections for the proposed Positron products. <br /> <br />j. Install and configure the mobile software on all remaining Santa Ana-supplied MDCs. <br /> <br />k. Assume all responsibility and costs for acquisition, shipping, installation of hardware and <br />third party software not provided by Positron. Hardware must conform to Positron <br />specifications. <br /> <br />Completion Criteria: <br /> <br />~ <br /> <br />a. This task is considered complete when the primary IQjCAD and related third party <br />application software provided by Positron has been installed on the SAPD hardware specified by <br />Positron and has been certified by Positron to be operational and when each interface is <br />installed and unit tested. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 20 of 149 <br /> <br />~ <br />