Laserfiche WebLink
<br />ITEM #: 00 <br />BIDDER'S STATEMENT I PROJECT BUDGET <br /> <br />BIDDER'S STATEMENT <br /> <br />I propose to complete the work described above for the sum of $ <br />This price includes a sufficient sum to cover all permits, permit fees, material, labor that are <br />required or implied for a complete job. <br />Note: (Davis-Bacon I State Prevailing Wages apply to this project) <br /> <br />If awarded the bid, I will complete the work within <br /> <br />calendar days. <br /> <br />I certify that I have conducted a physical inspection of the property and that I have thoroughly <br />examined this Work Write-Up and General Requirements, <br /> <br />Company Name I DBA <br /> <br />Contractor's Signature <br /> <br />Date <br /> <br />Contractor's Printed Name I Title <br /> <br /> <br />TOTAL (CONTRACTOR'S LINE ITEMS) <br />TERMITE (CHEMICAL WORK) <br />CONSTRUCTION CONTINGENCY <br /> <br />$ <br />$ <br />$ <br />$ <br /> <br />GRAND TOTAL <br /> <br />WORK WRITE-UP / PROJECT #: SP-HWH/R07 <br />Page 12 of 12 <br /> <br />Owner's <br />Initials <br /> <br />Contractor's <br />Initials <br /> <br />