Laserfiche WebLink
<br />ITEM #: 1 <br />RE-ROOF - MAIN HOUSE, CARRIGAGE BARN AND GAZEBO <br /> <br />Priorit Code: <br />Location: <br />Existin Condition: <br /> <br /> <br />Three Structures <br /> <br />General Requirements: <br />Q CONTRACTOR will comply with the General Requirements located on pages 2 and 3 of this <br />Work Write-Up. <br /> <br />Contractor Will Provide All Labor And Material To: <br />Q Remove and dispose of the existing composition and flat/low pitch roofing, exposing the <br />sheathing for inspection, The repair or replacement of damaged and/or deteriorated sheathing <br />and roof system members shall be addressed by an authorized change order. All change <br />orders shall be approved by, the homeowner and the Project Manager, prior to contractor <br />commencing with any additional work, <br />o Contractor shall expose the entire roof system sheathing and provide the City of Santa Ana's <br />Project Manager and the City's Building Official a visual inspection of the (opened roof <br />system). Project Manager and City Building Official shall inspect the roof system for any <br />additional damages. <br />Q Contractor shall set up City of Santa Ana Building/Safety inspections. <br />o Contractor shall notify the City's Project Manager, (24 hours in advance) prior to the tear-off of <br />the existing roofing materials. <br />Q Install new % inch COX plvwood solid sheathing over all spaced sheathinQ areas. <br />Q Install a new "40 vear" asphalt I fiberglass roof shingles over solid sheathing. <br />Q Install a new built-up roof system (hot-mop) over all exiting flat I low pitch roofs/areas. <br />o Install all new roofing materials per the manufactures specifications and recommendations. <br /> <br />Item Includes: <br />o The replacement of all roof metals; edge metal, flashings, valleys, transition sheet metals. <br />Q The installation of new 30 Ib, felt paper over new plywood sheathing. <br />o Item also includes the lifting (removal) and proper re-installation of any heating/cooling <br />systems, satellite dishes, antennas and/or cables, rain gutters/down-spouts and wrought Iron <br />work. <br />Q Properly frame-in, metal flash, and seal around all roofing against walls and platforms, <br />Include all materials required to properly slope (taper away) and divert any potential <br />surface- water, away form the roof mounted equipment and at flat roof areas. <br />Q Painting of all new or existing roof metals, (Match new roofing material) <br />Q Clean up of all roof related debris. (Including all loose nails and/or shingle fasteners) <br /> <br />Special Conditions: <br />Q Note: The existing roof is an asphalt composition shingle, <br />Q Existing pitched/flat roofs are at approximately a 1/12 - 11/12. <br />Q Existing cooling or heating system to remain, (If existing) <br />Q Existing damaged wood (fascia) boarding at perimeters shall be all removed and replaced <br />with new materials. (Match existing) All exposed new and bare wood shall be properly primed <br />(ready for paint). <br />Q Contractor shall provide a fee schedule for replacement of woodwork (fascia, trim, sheathing). <br /> <br />WORK WRITE-UP / PROJECT #: SP-HWH/R07 <br />Page 4 of 12 <br /> <br />Owner's <br />Initials <br /> <br />Contractor's <br />Initials <br />