My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA HISTORICAL PRESERVATION SOCIETY 14A - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
SANTA ANA HISTORICAL PRESERVATION SOCIETY 14A - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 11:08:07 AM
Creation date
3/19/2008 9:32:42 AM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA HISTORICAL PRESERVATION SOCIETY
Contract #
A-2008-030
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
2/4/2008
Insurance Exp Date
7/30/2008
Destruction Year
2016
Notes
Amends A-2007-105-056
Document Relationships
SANTA ANA HISTORICAL PRESERVATION SOCIETY 14 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(J Contractor will provide the owner with all of the manufacturers' warranties and product <br />information. <br /> <br />Note; Lead Based Paint (LBP) <br />The exterior of the buildings/structures were tested for LBP; There were no levels of lead <br />found that were at or above the Department of Health Service or OSHAS detection limits <br />according the consultant's report. <br />(Note: The interior of Main House and Carriage Barn was not tested for LBP) <br /> <br />Contractor shall reference attached Lead Based Paint Survey submitted by: <br /> <br />Rincon Consultants, Inc. <br />(Ambient Environmentallnc,) <br />For the property: <br />Howe-Waffle House <br />120 Civic Center Drive <br />Santa Ana, CA 92701 <br /> <br />Project# 07-1440 <br />Dated: June 8, 192007 <br /> <br />. I E IF S h d I <br /> <br />Materia / quipment ee c e u e: <br />Item Description / Manufacturer / Model Cost Allowance <br />Paint (Main Body) Dunn-Edwards Paint $ <br />Paint (Trim 1) Dunn-Edwards Paint $ <br />Paint (Trim 2) Dunn-Edwards Paint $ <br />Paint (Trim 3) Dunn-Edwards Paint $ <br /> <br />Total Cost (This Item: <br /> <br />Note: Davis-Bacon / State Prevailin <br /> <br /> <br /> <br />ermits, fees, material, labor, su ervision, overhead and rofit. $ <br /> <br />WORK WRITE-UP I PROJECT #: SP-HWH/R07 <br />Page 7 of 12 <br /> <br />Owner's <br />Initials <br /> <br />Contractor's <br />Initials <br />
The URL can be used to link to this page
Your browser does not support the video tag.