My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION - 2008
Clerk
>
Contracts / Agreements
>
U
>
URS CORPORATION - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 12:27:45 PM
Creation date
3/26/2008 3:02:12 PM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION
Contract #
A-2008-048
Agency
Clerk of the Council
Council Approval Date
3/3/2008
Insurance Exp Date
5/1/2011
Destruction Year
0
Notes
AUTO 5/1/11, PROF LIAB 5/1/11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
correspond with the impacts. For each measure, the Reporting Process, Timing of Measure, <br />Responsible Party, and Verification of Compliance will be identified. The ECR will be included in <br />each Final EA and reviewed as part of those documents. <br />Assumptions/Deliverables: <br />Draft and final responses to comments submitted to the City and Caltrans for review and <br />concurrence (5 copies plus electronic files). <br />> Draft Final EA/FONSI for final concurrence by the City and Caltrans (10 copies). <br />y Final EA/FONSI (30 copies and one electronic PDF copy). <br />Final technical studies bound (10 hard copies and one electronic PDF copy). <br />PROJECT SCHEDULE <br />The following schedule presents the major tasks, subtasks, and milestones that will be <br />required to complete the CEQA and NEPA documentation for this project. The duration <br />associated with each task are shown, along with the review periods for agency <br />consideration of draft documents. The relational logic between the various tasks and <br />subtasks is embedded in the schedule to create the critical path for the project. The critical <br />path activities are shown by the red bars in the schedule, which are generally related to the <br />environmental process. With our multitude of experience preparing CEQA and NEPA <br />documents, including Caltrans and FHWA's requirements, the URS team is able to <br />commit to meeting the 14-month schedule from notice to proceed to a final signed <br />Final EA/FONSI. <br />16
The URL can be used to link to this page
Your browser does not support the video tag.