My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22E - POOL REFINISHING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
04/07/2008
>
22E - POOL REFINISHING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:32:37 PM
Creation date
4/2/2008 11:29:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22E
Date
4/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR <br />COUNCIL ACTION <br /> <br /> <br />CITY COUNCIL MEETING DATE: <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />APRIL 7, 2008 <br /> <br />CONTRACT AWARD FOR <br />POOL REFINISHING AT <br />SANTA ANITA PARK POOL <br />(SPEC. NO. 08-012) <br /> <br />APPROVED <br /> <br />D As Recommended <br />D As Amended <br />D Ordinance on 1 sl Reading <br />D Ordinance on 2nd Reading <br />D Implementing Resolution <br />D Set Public Hearing For <br /> <br />~ <br /> <br />CI Y MANAGER <br /> <br />CONTINUED TO <br /> <br />FILE NUMBER <br /> <br />RECOMMENDED ACTION <br /> <br />Award a contract to Condor, Inc. for pool refinishing at Santa Anita Park <br />in the amount of $45,760. <br /> <br />DISCUSSION <br /> <br />The Parks, Recreation and Community Services Agency maintains and operates <br />five swimming pools, which provide a wide variety of aquatics programs for <br />the community. The pools, four of which are over 20 years old, require <br />resurfacing as needed. Parks Services has been systematically replacing the <br />fiberglass linings with plaster surfaces at the pools for enhanced safety <br />and efficient routine maintenance. <br /> <br />The Santa Anita Center pool, which serves over 1,500 residents annually <br />with recreation swim programs, is the final pool to be renovated. The <br />fiberglass lining, which was installed in 1985, has started to detach from <br />the wall and floor surface areas due to weather and use. The original <br />lining will be removed and replaced with a new plaster surface. When the <br />renovation is complete, the preventative maintenance program calls for <br />resurfacing of the pool every 10-15 years. With council approval, this <br />renovation will be complete before the beginning of the summer season. <br /> <br />The notice inviting bids was advertised on February 21, 2008 and bids were <br />solicited. A summary of the bid invitations and bids received is as <br />follows: <br /> <br />16 Invitations For Bid mailed <br />1 Invitation For Bid mailed to a Santa Ana vendor <br />3 Bids received <br /> <br />Bids were received, opened on March 11, 2008, and evaluated (Exhibit 1). <br />The bid received from Condor, Inc. is responsive to the specifications and <br />meets the City's requirements. A 10 percent contingency has been included <br />for unanticipated minor modifications. <br /> <br />22E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.