My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - ARTESIA PILAR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
04/07/2008
>
23A - ARTESIA PILAR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:32:38 PM
Creation date
4/2/2008 11:29:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
4/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL MEETING DATE: <br /> <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />REQUEST FOR <br />COUNCIL ACTION <br /> <br />APRIL 7, 2008 <br />TITLE: <br /> <br />APPROVED <br /> <br />CONTRACT AWARD FOR ARTESIA <br />PILAR NEIGHBORHOOD WATER MAIN <br />REPLACEMENT (PROJECT NO. 08- <br />3208) <br /> <br />o As Recommended <br />o As Amended <br />o Ordinance on 1 sl Reading <br />o Ordinance on 2nd Reading <br />o Implementing Resolution <br />o Set Public Hearing For <br /> <br />I <br />ryi <br /> <br />(~ <br /> <br />CITY - A fS..G R <br /> <br />CONTINUED TO <br /> <br />---------. <br /> <br />FILE NUMBER <br /> <br />~ECOMMENDED ACTION <br /> <br />/ <br />~. Award a contract to Dominguez General Engineering, Inc., the lowest <br />responsible bidder, in accordance with unit bid prices in the <br />estimated amount of $1,795,000 for construction of the Artesia Pilar <br />Neighborhood Water Main Replacement. <br /> <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $2,243,700. <br /> <br />DISCOSSION <br /> <br />This project provides for the replacement of deteriorated and undersized <br />water pipes in the Artesia Pilar Neighborhood (Exhibit 1). The <br />improvements include installation of new water mains, fire hydrants, main <br />gate valves, and water services. Once completed, breaks and leaks <br />associated with the older and deteriorated water mains will be <br />eliminated. In addition, water service capacity and fire protection to <br />the areas served by these new water mains will be enhanced. <br /> <br />The Notice Inviting Bids was advertised on February 13, and 15, 2008, and <br />bids were opened on March 6, 2008. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br /> <br />Santa Ana Contractors receiving notices: 8 <br />Contractors requesting bidding documents: 27 <br />Bids received: 15 <br />Bids received from Santa Ana Contractors: 1 <br /> <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.