Laserfiche WebLink
12/09/ ?002 14:22 31F)375,P599 BEAVENS SYS?E��'S iPiC PAGE t71 <br />BEAVENS SYSTEMS INCORPORATED <br />2200 Pacific Coast Highway • Suite 307 • Hermosa Beach, CA 90254 <br />Phone 310.376.0506 • Fax 310.376.0599 • Email greg @beavens.com <br />December 9, 2002 <br />Nabil Saba <br />City of Santa Ana Water Resources Division <br />220 S. Daisy Ave. <br />Santa Ana, CA 92703 <br />Post-It- Fax Note 7671 <br />Date 12,162 Pagas� 7, <br />TOM L. 5„iyJA <br />From AA6AAjo <br />%1`9 ka A <br />'0 t/DNS DNS <br />Phone 0 <br />PhOnQ r <br />Fa e % t _ 7. 3/ �t -2 <br />pp <br />F- I <br />RE: East Reservoir Bypass Control Valve Programming & Training Proposal <br />Nabil, <br />This proposal is to provide the City of Santa Ana with a model program for control of <br />filling tanks in your system. East Reservoir will be used as the model and commissioned <br />under this proposal. Items included in the proposal include control strategy development, <br />PLC programming, training on the programming and I day of start -up assistance for the <br />East Reservoir installation. The PLC logic will be a variation of a Beavers; Systems <br />previously programmed MWD connection. The training class should require <br />approximately 1 day of time. In the class the following items will be covered: the PLC <br />logic, operation of the station control loop, interfacing with the existing SCADA system <br />and testing of field signals. The Start -up of the East Reservoir Station will occur on the <br />day after training. The goal of this is to provide the City of Santa Ana with a model <br />"Bypass Control Valve" logic that can be modified by and reused for the City of Santa <br />Ana for their other tanks. <br />Total cost for the aforementioned services is a not to exceed value of $4800.00. Billing <br />for the project will be on an as used basis. We are including a Beavens Systems' rates <br />sheet for breakdown on hourly rate, mileage rate and billing methods. Scheduling for the <br />class will probable require 2 weeks. The start -up does not have to follow the training <br />class immediately, but as soon as possible is desirable. If you have any questions <br />regarding this proposal, feel free to call, page or email me for further information. <br />Cell/Pager310.466.1973. <br />Regards, <br />J 0 <br />Greg Argano <br />NFSlbobalC1ty of Santa AnaltralnlnplEast Reservoir Bypass Control Valve Loplo.doc <br />EXHIBIT A <br />