Laserfiche WebLink
APRIL 14, 2008 <br />PAGE 3 OF 5 <br />m) Provide a "unistrut" detail for the utility cabinet; an <br />"H-frame" is not acceptable. <br />n) Provide a note on the plans stating "install underground <br />utilities sleeving for two carriers during construction <br />of the structure." The sleeving should go underground <br />through the caisson; shrouds on the outside of the pole <br />are not acceptable. All utilities, coaxial and conduit, <br />for the project should be designed to be underground; <br />this should eliminate the need for an "ice bridge." <br />o) All exterior conduit and electrical meters shall be <br />installed and screened in one metal enclosure painted to <br />match the structure. <br />p) If a permanent generator is located on-site, it must meet <br />all local and regional requirements. <br />8. The permit applicant recognizes that the frequencies used by <br />the cellular facility located at 2210 North Grand Avenue are <br />extremely close to the frequencies used by the City of Santa <br />Ana for Public Safety. This proximity will require <br />extraordinary "comprehensive advanced planning and frequency <br />coordination" engineering measures to prevent interference, <br />especially in the choice of frequencies and radio ancillary <br />hardware. This is encouraged in the "Best Practices Guide" <br />published by the Association of Public-Safety Communications <br />Officials-International, Incorporated (APCO), and as endorsed <br />by the Federal Communications Commission (FCC). Prior to the <br />issuance of any permits to install the facility, (permit <br />applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Communications Division of <br />the Orange County Sheriff-Coroner Department to minimize, to <br />the greatest extent possible, any interference with the Public <br />Safety 800 MHz Countywide Coordinated Communications System <br />(CCCS) Similar consideration shall be given to any other <br />existing or proposed wireless communications facility that may <br />be located on the subject property. <br />9. At all times, the permit applicant shall not prevent the City <br />of Santa Ana from having adequate spectrum capacity on the <br />City's 800 MHz radio frequency. <br />75A-17 <br />