My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2008-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
05/05/2008
>
FULL PACKET_2008-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:31:39 PM
Creation date
4/30/2008 3:31:01 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
862
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. The permit applicant will provide a "single point of contact" in its <br />Engineering and Maintenance Departments to insure continuity on all <br />interference issues. The name, telephone number, fax number and a-mail <br />address of that person shall be provided to the City's designated <br />representative upon activation of the facility. <br />13. The permit applicant shall insure that lessee or other user(s) shall comply <br />with the terms and conditions of this permit, and shall be responsible for <br />the failure of any lessee or other users under the control of permit <br />applicant to comply. <br />14. The permit applicant shall provide a coverage and cell site location map <br />for each existing and proposed facility in Santa Ana. <br />15. The proposed wireless communication structure must be engineered to <br />allow the co-location of other service providers. <br />16. Locate all equipment and related appurtenances (appleton plug and <br />electric meter) on the inside of the equipment enclosure or inside the <br />building and underground all electrical power from the utility source shown <br />on the approved site plan. <br />17. Conditional Use Permit No. 2006-08 expires 10 years from the date of City <br />Council approval. <br />18. Sprint PCS and T-Mobile, the lessees for the wireless facility, agree to <br />remove any graffiti on the proposed equipment cabinets and wrought iron <br />perimeter fence. Graffiti removal must be done within 24 hours from <br />occurrence. <br />Resolution No. 2008- <br />Page 8 of 8 <br />75A-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.