My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:43:18 PM
Creation date
5/8/2008 3:41:47 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2008-085
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
Professional ins exp 04/30/2011; Auto exp 11/01/11 Amended by A-2009-010
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />PROFESSIONAL ENGINEERING SERVICES FOR THE RENOVATION OF MEMORIAL PARK <br />POOL AND THE REHABILITATION OF PLAZA OF <br />THE FOUNTAINS PROJECTS <br />I. INTRODUCTION <br />The City of Santa Ana Public Works Agency desires to enter into an agreement with a qualified <br />consulting engineering firm with a proven track record of completing large pool and fountain <br />renovation projects for the professional engineering services of swimming pool renovation, fountain <br />rehabilitation, and related infrastructure rehabilitation. The major elements of the project are the <br />assessment and analysis of the existing conditions and the subsequent preparation of Plans, <br />Specifications, and Estimate (PS&E) of the following projects: <br />• Swimming pool renovation at Santa Ana Memorial Park. <br />• Fountain rehabilitation at Plaza of the Fountains in Civic Center. <br />II. PROJECT BACKGROUND <br />Santa Ana Memorial Park Pool (Memorial Pool) was constructed at the corner of Flower Street and <br />Saint Gertrude Place in 1961. It is a heavily used public pool opening seasonally from Memorial Day <br />to Labor Day. The pool is approximately 167 feet in length, 65 feet in width and depths ranging from <br />three (3) to twelve (12) feet. The pool holds approximately 600,000 gallons. Memorial Pool was last <br />renovated in 1994. The annual maintenance costs are rising and several major issues are emerging, <br />such as black algae, leakage, and other problems which are affecting program activities. <br />Plaza of the Fountains is located within Santa Ana Civic Center, at the corner of Santa Ana Boulevard <br />and Flower Street. Civic Center Law Library Fountain (a.k.a. Plaza Fountain No. 3) was built in 1970 <br />in the Plaza of the Fountains due south of Orange County Law Library. Due to deteriorations and <br />maintenance problems, the fountain has ceased operations since 2002. In 2002, Holmes and Narver <br />prepared the rehabilitation plans for Plaza Fountain No. 3 as well as the reflecting pool adjacent to the <br />east side of the Law Library. Funding was only available at that time to implement construction at the <br />reflecting pool. Upon completion, design issues surfaced once operations commenced so the design <br />approach for Plaza Fountain No. 3 shall be reanalyzed and modified accordingly. The previous base <br />design can be used as a reference; however, the Consultant is responsible for updating the plans to <br />reflect current standards and redesigning the pump system for a more effective operating system. <br />III. SCOPE OF WORK <br />Consultant shall be responsible for the preparation and submittal of PS&E through completion with the <br />approval of the City of Santa Ana. The PS&E of the pool renovation and fountain rehabilitation shall <br />be prepared separately for bid and awards purpose. The following is the breakdown of the scope of <br />work for the project. Any additional tasks deemed necessary by the Consultant shall be clearly <br />identified in the proposal. <br />A. Management and Administration <br />Consultant is fully responsible for the overall project management, administration and <br />coordination for the project, including but not limited to the following: <br />1. Management and Coordination —Consultant shall be the liaison with affected agencies, <br />monitor project progress and maintain project files. Other responsibilities of Consultant include <br />supervising, coordinating, monitoring and reviewing design for conformance with local agencies <br />standards, policies and procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.