My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:43:18 PM
Creation date
5/8/2008 3:41:47 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE)
Contract #
A-2008-085
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Insurance Exp Date
5/1/2011
Destruction Year
2022
Notes
Professional ins exp 04/30/2011; Auto exp 11/01/11 Amended by A-2009-010
Document Relationships
PACIFIC ADVANCED CIVIL ENGINEERING INC. (PACE) (2) - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING FEE <br />PROPOSAL <br />Project Data <br />Project Name: City of Santa Ana Pool Renovation and Fountain <br />Rehabilitation Project <br />Client: City of Santa Ana <br />PACE Job Number: 9076EP <br />Proposal Date: March 7, 2008 11 <br />2008 Hourly Rate Schedule <br />Work Item Description <br />Description Hourly Rate <br />Principal <br />$200 <br />Sr. Proj. Mgr./Sr. Consulting Engr. <br />$170 <br />Project Manager /Consulting Engr. <br />$160 <br />Sr, Proj. Engr./Sr. Design Engr. <br />$145 <br />Controls Engineer <br />$140 <br />Proj. Engr/Design Engineer II <br />$127 <br />Design Engineer <br />$100 <br />Designer/Technical Specialist <br />$100 <br />Sr. CAD Designer/Sr. GIS Analyst <br />$105 <br />CAD Designer/GIS Analyst <br />$85 <br />Graphic Designer <br />$80 <br />Proj. Coordinator/Admin. Support <br />$65 <br />Exhibit B <br />Total Cost: 1 $74,490 <br />Total Cost w/ Alternate <br />bid it, $79,170 <br />Item No. <br />Work Item Description <br />Sr. Project <br />Manager/Sr. <br />Principal Consultin En r. <br />Project Mgr./ <br />Consultin En r. <br />Sr. Project <br />Engineer/S r. <br />Desi n En r. <br />Estimated Manhours <br />Project <br />Engineer <br />Controls /Design Design <br />En ineer En r. II Enciineer <br />Sr. CAD <br />Designer <br />Designer/T /Sr. GIS <br />ech. S ec. Analyst <br />CAD <br />Designer <br />/GIS Anal st <br />Proj. Coord/ <br />Graphic Admin <br />Desi ner support <br />Man -Power <br />Subtotal <br />Reimburs. <br />Expenses <br />Total Task <br />Costs <br />A <br />Task 1.0 Management/ Administration <br />Task 1.1: Management Coordination <br />4 <br />16 <br />$2,280 <br />$2,280 <br />Task 1.2: Meetings (5)- Agenda Meeting Minutes <br />8 <br />24 <br />10 <br />$5,850 <br />$5,850 <br />Task 1.3: Progress Report <br />4 <br />4 <br />$900 <br />$900 <br />Task 1.4: Project Schedule <br />4 <br />4 <br />$900 <br />$900 <br />B <br />Task 2.0 Permits <br />Task 2.1: OC Health <br />8 <br />16 <br />16 <br />$4,240 <br />$4,240 <br />C <br />Task 3.0 Research & Data Collection <br />Task 3.1: Research & Data Collection <br />4 <br />4 <br />$1,040 <br />$1,040 <br />D <br />Task 4.0 PS & E Preparation <br />Task 4.1: Engineering Design Services- Renovation of Memorial Pool <br />40 <br />40 <br />80 <br />$17,200 <br />$17,200 <br />Task 4.2: Engineering Design Services: Civic Center Law Library <br />Fountain <br />Task 4.3: Utility Coordination & Design included in Design Services) <br />4 <br />24 <br />24 <br />40 <br />$10,320 <br />$10,320 <br />$0 <br />Task 4.4: Electrical Design <br />$5,000 <br />$5,000 <br />Task 4.5: Structural Design/ Pool Deck Edge <br />$2,400 <br />$2,400 <br />Task 4.6: Mechanical Ventilation only) <br />$2,400 <br />$2,400 <br />Task 4.7: Plan Preparation included above <br />$0 <br />Task 4.8: Specifications <br />4 <br />24 <br />1 <br />16 <br />$3,040 <br />$3,040 <br />Task 4.9: Cost Estimate <br />4 <br />8 <br />24 <br />4 <br />$3,680 <br />$3,680 <br />E <br />Task 5.0 Construction Support Activities <br />Task 5.1: Bidding Services <br />4 <br />8 <br />8 <br />$640 <br />$640 <br />Task 5.2: Submittal Review <br />4 <br />8 <br />$800 <br />$800 <br />Task 5.3: RFI <br />16 <br />24 <br />$4,960 <br />$4,960 <br />Task 5.4: Field Visits <br />8 <br />8 <br />$2,080 <br />$2,080 <br />Task 5.5: As -Built <br />4 <br />4 <br />16 <br />$1,760 <br />$1,760 <br />Reimbursables estimate, amount to be billed is cost + 10% <br />$5,000 <br />TOTALS <br />0 20 <br />156 <br />0 <br />0 0 <br />200 <br />0 0 <br />152 <br />0 46 <br />$69,490 <br />$5,000 <br />$74,490 <br />Add- Alternate bid Items 8 16 24 $4,680 $4,680 <br />This fee proposal is valid for 90 days from March 7, 2008. <br />
The URL can be used to link to this page
Your browser does not support the video tag.