My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-21 Regular
Clerk
>
Minutes
>
CITY COUNCIL
>
2000-2009
>
2008
>
2008-04-21 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:17:18 PM
Creation date
5/9/2008 8:24:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Doc #
04/21/08 Reg.
Date
4/21/2008
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WORK STUDY <br /> <br />. Street Reconstruction/Resurfacing = $10,091,319 and includes Civic <br />Center drive from French to Santiago; Fifth Street rehabilitation from <br />Fairview Street to Jackson Street; McFadden Avenue from Bristol to <br />Flower; McFadden Avenue from Standard to Maple; pavement <br />management; Plaza Drive from MacArthur to Sunflower; rehabilitation <br />of bridges at Fifth Street and McFadden Avenue; Segerstrom Avenue <br />from Bristol to Raitt , Raitt to Fairview, and Fairview to Harbor; <br />Standard Avenue from Warner to First; Susan Street from MacArthur <br />to Sunflower <br />. Total Arterial Improvements = $56,339,119 <br />. Traffic Improvements = $16,659,700 and includes Fairview/Harbor <br />interconnect and intertie with Fountain Valley; Harbor at Kent (traffic <br />signal); Railroad Grade Crossing Enhancement Safety and Quiet Zone <br />Improvement projects; System detection and transportation information <br />system; Santa Ana at Flower traffic signal modification; Santa <br />Ana/Garden Grove "Go Local" concept study; SBC rental fee for signal <br />interconnect; Traffic management plans; Traffic Signal Capital <br />Improvement <br />. Sewer Improvements = $1,450,000 and includes sewer main hot spot <br />repairs and main replacements; sewer reconstruction at Parton Street <br />_ 15th to Washington; sewer reconstruction at Van Ness Avenue, North <br />of Warner; sewer reconstruction at Washington Avenue - Bristol to <br />Pacific <br />. Water main replacements = $4,600,000 <br />. Underground utilities = $1,634,000 and includes Bristol Street - Third <br />to Civic Center; Grand Avenue - First to Fourth <br />. Total Infrastructure Improvements = $7,684,000 <br />. Park improvements or renovations include the follow projects: <br />o Centennial Sanctuary Peninsula Water flow at Centennial Park <br />o Centennial road renovation <br />o "Cienegas de las Ranas" habitat renovation at Thornton Park <br />o Fairview triangle rest stop <br />o Flower Street bike trail extension <br />o McFadden Triangle Landscaping <br />o Santa Anita pool resurfacing <br />o Santa Ana Zoo "Tierra de las Pampas" exhibit <br />o Thornton Park Basketball Court <br />. Total Park Facility Improvements = $3,362,500 <br /> <br />Following the presentation on the 2008-2009 fiscal year Capital <br />Improvement Program, Council discussion ensued. <br /> <br />CITY COUNCIL MINUTES <br /> <br />112 <br /> <br />APRIL 21, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.