My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. 2 -2008
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. 2 -2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:58:52 PM
Creation date
5/22/2008 12:59:53 PM
Metadata
Fields
Template:
Contracts
Company Name
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC.
Contract #
A-2008-084
Agency
PUBLIC WORKS
Council Approval Date
5/5/2008
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />· Separate pricing is requested for replacing all conduit with 1 Y2-inch conduit <br />installed 18 to 36 inches below grade. <br />. Remove potheads from street light poles as work progresses. <br />. Remove all pull boxes except for required boxes as work progresses. <br />. Install new globes. <br />· This is a working system; system must be de-energized each morning and re- <br />energized each afternoon. Contractor is responsible for keeping street lighting <br />system operational. <br />. Lockout/tagout is required. <br />. Proper disposal or recycling of hazardous materials is required. <br />. Work shall start from the service point and proceed to completion of one circuit <br />prior to starting work on another circuit. <br />· All connections must be made by the end of each day as the system shall be <br />energized each evening. At no time can a cable be left unconnected prior to <br />energizing. <br />. All return lines must be separate and identifiable. <br />. A sketch of a typical cable replacement is attached. <br /> <br />The City acknowledges the complexity of this project, the scope of work requested and <br />that unforeseen work may be required during the scope of the project. A map showing <br />street light locations and service points is attached to this proposal (EXHffiIT A-I). <br />Funding will be allocated over a three or four year period until the work is completed. <br />The City, at the discretion of the Director, reserves the right to decrease the scope of <br />work during the duration of the agreement <br /> <br />The Contractor shall provide at his own risk and cost all labor, materials, tools, <br />equipment, traffic control and miscellaneous devices, transportation, hauling, dumping, <br />recycling of construction and demolition material, and proper disposal and/or recycling of <br />hazardous materials as part of this project. <br /> <br />II. APPROVED MATERIALS <br /> <br />A. CONDUIT <br /> <br />1. Rigid, nonmetallic electrical conduit <br />2. Sizes: <br /> <br />I" <br />1 1,4" <br />1 Y2" <br />2" <br />3. Fittings to match conduit sizes <br /> <br />B. CONDUCTORS <br /> <br />1. A WG wire size #8 solid copper wire. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.