Laserfiche WebLink
06 <br />Premium:$1,042.00 <br />Term: 5/22/08 - 5/21/09 <br />Bond No 4368778 <br />PERFORMANCE BOND — PRIME OR GENERAL CONTRACTOR <br />KNOW ALL BY THESE PRESENTS that (Public Works) <br />[Block containing name and address of Contractor /Principal] <br />Bell Building Maintenance Company <br />5170 Sepulveda Blvd., Ste. 180 <br />Sherman Oaks, Ca. 91403 <br />as Principal, and <br />SureTec Insurance Company <br />952 Echo Lane, Suite 450 <br />Houston, Texas 77024 as Surety, are held and firmly bound unto <br />[Block containing name and address of Owner /Obligee] <br />City Of Santa Ana <br />20 Civic Center Plaza(M -30) <br />P.O. Box 1988 <br />Santa Ana, Ca. 92702-1988 as Obligee <br />intheamountof Sixty -nine Thousand, Four Hundred Forty -four and no /100 <br />$69,444.00 for the payment whereof Principal and Surety bind themselves, their heirs, <br />executors, administrators, successors and assigns firmly by these presents. The combined aggregate liability <br />of the Surety shall be limited to the above stated sum, not withstanding anything to the contrary in the below <br />stated Contract. <br />WHEREAS, Principal has by written agreement dated 05 -2-3-200,9 entered into a contract (referred to <br />here as "Contract ") with Obligee for the performance of <br />Janitorial �Pr �; ,.A� ; n n; �� r; } R q (the Contract "Work ") <br />NOW THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if the Principal shall perform the <br />Work required by the Contract, then this obligation shall be null and void, otherwise it remains in full force and <br />effect. <br />If there is no Obligee default, the Surety's obligation shall arise after the Obligee has notified the Contractor <br />and the Surety at the addresses set forth above that the Obligee is considering declaring a Contractor Default <br />and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not <br />later than fifteen days after Surety's receipt of such notice to discuss methods of performing the Work to be <br />performed under the Contract; and if such meeting is not successful, the Obligee has declared a Contractor <br />Default and formally terminated the Contractor's right to complete the Contract Work. Such Contractor Default <br />shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as <br />