My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - APPROVAL AND ADOPTION ENTERPRISE ZONE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
06/02/2008
>
19E - APPROVAL AND ADOPTION ENTERPRISE ZONE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:30:41 PM
Creation date
5/28/2008 11:51:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19E
Date
6/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ ~ <br />Environmental Checkli~ <br />For CEQA Complianei <br /> Less Than <br /> Significant <br /> Potentially with Less Than <br />Issues 8 Su <br />pporting Information Sources Significant Mitigation Significant <br /> Impact Incorporated Impact <br />VII. Hazards and Hazardous Materials -Would the project: <br />A. Create a significant hazard to the public or the ^ ^ <br />environment through the routine transport, use or <br />disposal of hazardous materials? <br />'. - B. Emit hazardous emissions or handle hazardous or <br />t ^ ^ <br />acu <br />ely hazardous materials, substance or waste <br />within one-quarter mile of an existing or proposed <br />school? <br />C. Be located on a site which is located on a list of ^ ^ <br />hazardous materials sites compiled pursuant to <br />Government Code Section 659662.5 and, as a <br />result, would it create a significant hazard to the <br />public or the environment? <br />D. For a project located within an airport land use <br />l ^ ^ <br />p <br />an or where such a plan has not been adopted <br />, <br />within two miles where of a public airport or public <br />use airport, would the project result in a safety <br />hazard for people residing or working in the project <br />area? <br />VIII. Hydrology and Water Quality -Would the project: <br />A. Violate Regional Water Quality Control Board ^ ^ <br />water quality standards or waste discharge <br />requirements? <br />B- Substantially deplete groundwater supplies or ^ ^ <br />interfere substantially with groundwater recharge <br />such that there would be a net deficit in aquifer <br />volume or a lowering of the local groundwater table <br />level (i.e., the production rate of pre-existing <br />nearby wells would drop to a level which would not <br />support existing land uses or planned uses for <br />which permits have been granted)? <br />Santa Ana State Enterprise Zone <br />Initial Study November2007 <br />3-8 <br />J&S 00614.07 <br />19E-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.