My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - APPROVAL AND ADOPTION ENTERPRISE ZONE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
06/02/2008
>
19E - APPROVAL AND ADOPTION ENTERPRISE ZONE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:30:41 PM
Creation date
5/28/2008 11:51:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19E
Date
6/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist <br />For CEQA Compliance <br />G. Conflict with adopted policies supporting ^ ^ ® ^ <br />alternative transportation (e.g. bus turnouts, bicycle <br />racks)? <br />Issues & Supporting Information Sources <br />XVI. Utilities and Service Systems <br />A. Exceed wastewater treatment requirements of the <br />applicable Regional Water Quality Control Board? <br />B. Require or result in the construction of new water <br />or wastewater treatment facilities or expansion of <br />existing facilities, the construction of which could <br />cause significant environmental effects? <br />C. Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br />D. Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or <br />are new or expanded entitlements needed? <br />E. Result in the determination by the wastewater <br />treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the <br />project's projected demand in addition to the <br />provider's existing commitments? <br />F. Is the project served by a landfill with sufficient <br />permitted capacity to accommodate the project's <br />sold waste disposal needs? <br />G. Comply with federal, state and local statutes and <br />regulations related to solid waste? <br /> Less Than <br /> Significant <br />Potentially with Less Than <br />Significant Mitigation Significant No <br />Impact Incorporated Impact Impact <br />^ ^ ® ^ <br />^ ^ ® ^ <br />^ ^ ® ^ <br />^ ^ ® ^ <br />^ ^ ® ^ <br />^ ^ ® ^ <br />^ ^ ^ <br />Santa Ana State Enterprise Zone November2007 <br />Initial Study 3-13 <br />J8S 00814.07 <br />19E-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.