My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - TRAFFIC SIGNAL AND LIGHTING MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
06/02/2008
>
25M - TRAFFIC SIGNAL AND LIGHTING MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:30:51 PM
Creation date
5/28/2008 11:51:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25M
Date
6/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B-1 <br />CITY OF SANTA ANA PRICE LIST <br />Effective Date 1 September 2008 <br />Routine Maintenance -per unit <br />Traffic Signal $61.79 <br />Flashing Beacon $36.75 <br />CCTV $68.25 <br />CMS $68.25 <br />HAR $47.25 <br />Flashing Crosswalk $25.20 <br />2500 Lumen Lamp $3.41 <br />6000 Lumen Lamp $4.20 <br />Extraordinary Maintenance <br />Markup -material /labor 15% <br />Description Regular Overtime Double time <br /> Per hour per hour per hour <br />Superintendent $78.75 $90.30 $111.30 <br />Engineering Tech. $86.10 $113.40 $141.75 <br />Laboratory Tech $63.00 $82.95 $102.90 <br />Maint. Tech. -Lead $65.10 $86.10 $107.10 <br />Maint. Tech $54.60 $68.25 $84.00 <br />Utility Tech -Lead $86.10 $113.40 $141.75 <br />Utility Tech $65.10 $86.10 $107.10 <br />Lead High Voltage Tech $86.10 $113.40 $141.75 <br />Service Laborer $64.05 $85.05 $104.74 <br />Street Light Tech $49.35 $65.10 $80.85 <br />Labor & Material <br />6x6 circular loop (4 or less) $299.25 <br />6x6 circular loop (more than 4/intersection) $288.75 <br />6 circular loop (24 or less w/in mile) $288.75 <br />6 circular loop (25-48 w/in mile) $288.75 <br />6 circular loop (49+ w/in mile) $283.50 <br />Install #3 pull box $246.75 <br />Install #5 pull box $283.50 <br />Install #6 pull box $393.75 <br />Install City Furn. NEMA CMU $719.25 <br />Install City Furn. P44 TS Cabinet $1,391.25 <br />Install City Furn. 332 Cabinet $1,391.25 <br />Install ADA PPB $81.90 <br />Install Reflective SNS $603.75 <br />Test TS cabinet (not environmental) $787.50 <br />Paint Traffic Signal Cab $315.00 <br />Paint Vehicle Head $61.95 <br />Paint Pedestrian Head $38.85 <br />Paint Single Globe Street Light Pole $260.40 <br />Paint Double Globe Street Light Pole $288.75 <br />Paint 30' Steel Street Light Pole $341.25 <br />25M-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.