My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PUBLIC HEARING - FY 08-09 PROPOSED CITY BUDGET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
06/02/2008
>
75A - PUBLIC HEARING - FY 08-09 PROPOSED CITY BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:31:03 PM
Creation date
5/28/2008 11:51:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2008 <br /> <br />REVENUE PROPOSED <br /> <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE FY 07-08 <br />UNIT FEES FY 08-09 <br />FEES <br /> <br />SECTION IX PLANNING & BUILDING AGENCY <br />5918 5) Inspections for which no fee is specifically <br /> indicated (minimum chazge -one (1) hour) Per Hour 74.00 77.00 <br /> SOLAR ENERGY CODE <br />5914 Any person desiring a permit required by the Solaz Energy Each <br /> Code shall, at the time of filing an application, pay a fee of Permit 35.50 36.75 <br /> $6.00 towards the State Mandated Training Program and <br /> a fee equal to $30.75 plus the sum of the fees for the work to <br /> be done under the permit as set forth in the following <br /> schedule. There is no minimum fee for the issuance of a <br /> permit for single family residences and duplexes. The <br /> minimum total fee for issuance of a permit for all other uses <br /> shall be $60.00. 57.75 60.00 <br /> (NOTE: These fees do not include permit fees for any <br /> parts of the solar energy system which aze subject to the <br /> requirements of other applicable codes.) <br /> FEE SCHEDULE <br />5914 1) For collectors (including related piping and <br /> regulating devices): <br /> Up to 1,000 sq, ft. (93mZ) <br /> 8.75 9.10 <br /> Between 1,001 (93.1mZ) and 2,000 sq. ft. (186mZ) 14.75 15.35 <br /> More than 2,000 sq. ft. (18mZ) 14.75 15 <br />35 <br /> plus per 1,000 sq.ft. (93m2) or fraction 1.55 . <br />1.60 <br /> thereof over 2,000 sq. ft. (186mZ) <br />5914 2) For storage tanks (including related piping and <br /> regulating devices): <br /> Up to 750 gallons (3m') <br /> 7.50 7,gp <br /> Between 751 (3m3) and 2,000 gallons <br /> 13.50 14.00 <br /> More than 2,000 (8m') gallons <br /> <br />plus per 1,000 (4m3) or fraction thereof ] 3.50 14.00 <br /> <br />over 2,000 gallons (8m3) 1.55 1.60 <br />5914 3) For rock storage: <br /> Up to 1,500 cu. ft. (42m3) <br /> 8.75 9.10 <br /> Between 1,501 (42.1m3) and 3,000 cu. ft. (84m3) <br /> 14.75 15.35 <br /> More than 3,000 cu. ft. (84m3) <br /> <br />plus per 1,000 cu. ft. (28m3) or fraction 14.75 15.35 <br /> <br />thereof over 3,000 cu. ft. (84m3) 1.55 1.60 <br />56 <br />75A-72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.