Laserfiche WebLink
RESOLUTION 2008 <br /> PROPOSED <br />REVENUE FY 07-08 FY 08-09 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> <br />SECTION X PUBLIC WORKS AGENCY <br />86-01-5921 Curb Return, including Earthwork <br /> $123.85 minimum Each 63.95 66.57 <br /> Minimum 118.97 123.85 <br />86-01-5921 Sidewalk including Earthwork <br /> $123.85 minimum Sq.Foot 0.58 0.60 <br /> Minimum 118.97 123.85 <br />86-O1-5921 Drive Approach including Earthwork <br /> $123.85 minimum Sq. Foot 0.74 0.77 <br /> Minimum 118.97 123.85 <br />86-01-5921 Paving, including Earthwork <br />(0 - 2000 sq. ft.) $123.85 minimum Sq. Foot 0.23 <br />(Over 2000 sq. ft.) $123.85 minimum Sq. Foot 0.16 <br />Minimum 118.97 <br />86-O1-5921 Fencing <br /> Masonry, Concrete or Block <br /> $123.85 minimum Lineaz Foot <br /> Minimum <br />86-01-5621 Street Trees <br /> By Developer, Inspection Only - $87.95 min. Each <br />86-01-5921 Permanent Street Patch Guazantee <br /> Refundable if done in 30 calendar days Sq. Foot <br />86-O1-5921 Projects Exceeding $100,000 and/or Percent of estimated <br /> Work items not included here construction costs <br />86-O1-5621 Overtime Rate for Construction Inspectors Per Hour <br /> Construction Inspector overtime rate range. Actual overtime hourly - <br /> rate based on Inspectors salary step <br />5577 Certificate of Correction Minimum <br /> Per Hour <br />5577 Covenants, Conditions, & Restrictions; Agreements and Minimum <br /> Miscellaneous Checking Per Hour <br />68-01-5223 Sign Removal from Public Right of Way Per Sign <br />68-O1-5576 Sanitation Charge <br /> Bimonthly <br /> Single Family Per Unit <br /> Duplex Per Unit <br /> Triplex Per Unit <br /> Fourplex or lazger Per Unit <br /> Business Per Unit <br /> NOTE: Any portion of a building which is designed <br /> to be separately rentable and is separately identifiable <br /> by a letter or number designation shall constitute a <br /> separate and distinct unit, except that any publicly- <br /> owned building shall be a single unit. <br />86-01-5921 Survey Monument Check Per Hour <br /> Maximum <br />0.24 <br />0.17 <br />123.85 <br />1.42 1.48 <br />118.97 123.85 <br />30.50 31.75 <br />29.97 31.20 <br />3.25% 3.25% <br />52.33 - 56.31 55.70-59.95 <br />401.56 418.02 <br />133.86 139.35 <br />401.56 418.02 <br />133.86 139.35 <br />25.00 26.03 <br />14.91 14.91 <br />14.91 14.91 <br />14.91 14.91 <br />14.91 14.91 <br />14.91 14.91 <br />368.11 383.20 <br />1,104.38 1,149.66 <br />60 <br />75A-76 <br />