My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2008-06-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
06/02/2008
>
FULL PACKET_2008-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:30:37 PM
Creation date
5/29/2008 5:15:01 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCIL MEMBERS <br />David Benavides <br />Carlos Bustamante <br />Michele Martinez <br />Sal Tinajero <br />vncent F. Sarmiento <br />CITY OF SANTA ANA <br />PLANNING ~ BUILDING AGENCY <br />20 Civic Center Plaza (M-20) <br />P.O. BOX 1988 • Santa Ana, California 92702 <br />www.santa-ana.org <br />NEGATIVE DECLARATION <br />CITY MANAGER <br />David N. Ream <br />CITY ATTORNEY <br />Joseph W. Fletcher <br />CLERK OF THE COUNCIL <br />Patricia E. Healy <br />Pursuant to the Procedures of the City of Santa Ana for implementation of the California <br />Environmental Quality Act, the Environmental Evaluator has completed an Initial Study <br />for the project described below: <br />Project Number: ER No. 2007-190 <br />Applicant: City of Santa Ana <br />Project Location /Address: The proposed SEZ is contained entirely within <br />city limits and encompasses approximately 16.32 square miles. <br />Project Title /Description: The proposed SEZ is designed to attract new businesses, <br />create new jobs, and retain existing businesses and jobs in the city. The project would <br />allow businesses located within the SEZ to take advantage of state tax incentives and City <br />benefits. The SEZ, in and of itself, would not result in any specific construction projects, <br />land acquisition projects, or other development projects. The Santa Ana SEZ would have <br />a horizon year of 2023, extending 15 years from the June 7, 2008, expiration date of the <br />existing enterprise zone. <br />And does hereby find: <br />The proposed project would not create a significant effect on the environment. The <br />proposed project analyzed in the Initial Study would result in either no impactor less than <br />significant impact to each environmental factor evaluated. <br />C3~te; <br />Sergi c Planner <br />Thtg dIM8A1'1i11~8r! flGfAli atlo~P6ad ba+'tl1s d~i~ipn-I'n~tl~irgl r ~'~d~~isaf~fB++~ <br />t3ffi~i~l, and a 'natic~rt is died. <br />19E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.