Laserfiche WebLink
<br />9. All Public Art shall remain on the Property and may not be removed without the approval of <br />the Planning Commission. <br /> <br />10. Expenses not included in the Public Art Fee. <br /> <br />1. Expenses to locate the artistes) (e.g., airfare for artist interviews, etc.) <br /> <br />11. Architect and Landscape Architect fees incurred in connection with the Public <br />Work(s) of Art. <br /> <br />111. Landscaping around Public Work(s) of Art that is not included as part of the artist's <br />sculpture furnishings, including, but not limited to, functional structures, <br />prefabricated water or electrical features not created by the artist, and ornamental <br />enhancements. <br /> <br />IV. Utility fees associated with activating electronic or water generated artwork. <br /> <br />v. Lighting elements not integral to the illumination of the Public Art. <br /> <br />VI. Publicity, public relations, photographs, educational materials, business letterhead or <br />logos bearing artwork image. <br /> <br />V11. Dedication ceremonies, including sculpture unveilings or grand openings. <br /> <br />B-2 <br /> <br />DOCSOC/I 27 5524v I 0/024579-000 I <br /> <br />11 A-13 <br />