Laserfiche WebLink
<br />Bristol Street Widening <br />July 7, 2008 <br />Page 2 <br /> <br />remaining parcels. Once completed, these improvements will enhance the <br />ride quality, surface drainage, visual appearance and water capacity of <br />Bristol Street. <br /> <br />The Notice Inviting Bids was advertised on May 14 and 16, 2008, and bids <br />were opened on June 3, 2008. A summary of the bid invitations mailed, <br />the bids received, and the bid results follows. <br /> <br />Santa Ana Contractors receiving notices: 21 <br />Contractors requesting bidding documents: 38 <br />Bids received: 9 <br />Bids received from Santa Ana Contractors: 2 <br /> <br />NAME OF BIDDER <br /> <br />1. Sequel Contractors, Inc. <br /> <br />2. All American Asphalt <br />3. Sully Miller Contracting Company <br />4. Alliance Street Works <br />5. Griffith Company <br />6. Elite Bobcat Service, Inc. <br />7. R.J. Noble Company <br />8. Excel Paving Company <br />9. Hardy & Harper, Inc. <br /> <br />CITY <br /> <br />Santa Fe <br />Springs <br />Corona <br />Anaheim <br />Anaheim <br />Santa Ana <br />Corona <br />Anaheim <br />Long Beach <br />Santa Ana <br /> <br />BID AMOUNT <br /> <br />$4,522,071.00 <br /> <br />$4,625,000.00 <br />$4,732,425.00 <br />$4,922,322.50 <br />$4,978,165.65 <br />$5,159,534.00 <br />$5,254,926.80 <br />$5,434,388.25 <br />$6,185,195.00 <br /> <br />A total of nine bids were received and all were responsive. The lowest <br />bid was submitted by Sequel Contractors, Inc., for $4,522,071, which is <br />below the Engineer's estimate of $5,400,000. <br /> <br />ENVIRONMENTAL IMPACT <br /> <br />An Environmental Impact Statement (EIS) for the Bristol Corridor from <br />Warner to Memory Lane was approved by the City Council in 1990. This was <br />followed by a reevaluation of the EIS for the Pine to Third segment in <br />2003. <br /> <br />FISCAL IMPACT <br /> <br />The funding analysis shows a total estimated construction cost of <br />$5,652,000 for the project (Exhibit 2). Funds are available in the <br />Select Street Construction Fund (account no. 59-551-6631), the TSIA Fund <br />(account no. 35-631-6631) and the Measure M Street Construction Fund <br />(account no. 32-551-6631). <br /> <br />238-2 <br />