Laserfiche WebLink
i i <br />" '~~ Environmental Checklist <br />1 1 <br />CEQA Compliance <br /> Less than <br /> Significant <br /> Potentially with Less Than <br /> Significant Mitigation Significant No <br />Issues & Supporting Information Sources Impact Incorporated Impact Impact <br />B. Exceed, either individually or cumulatively, a level ^ ^ ® ^ <br /> of service standard established by the county <br /> congestion management agency for designated <br /> roads or highways? <br />C. Result in a change in air traffic patterns, including ^ ^ ^ <br /> either an increase in traffic levels or a change in <br /> location that results in substantial safety risks? <br />D. Substantially increase hazards to a design feature ^ ^ ^ <br /> (e.g., sharp curves or dangerous intersections) or <br /> incompatible uses (e.g., farm equipment)? <br />E. Result in inadequate emergency access? ^ ^ ^ <br />F. Result in inadequate parking capacity? ^ ^ ^ <br />G. Conflict with adopted policies supporting alternative ^ ^ ^ <br /> transportation (e.g., bus turnouts, bicycle racks)? <br />XVI. Utilities and Service Systems <br />A. Exceed wastewater treatment requirements of the ^ ^ ® ^ <br /> applicable Regional Water Quality Control Board? <br />B. Require or result in the construction of new water ^ ^ ® ^ <br /> or wastewater treatment facilities or expansion of <br /> existing facilities, the construction of which could <br /> cause significant environmental effects? <br />C. Require or result in the construction of new storm ^ ^ ® ^ <br /> water drainage facilities or expansion of existing <br /> facilities, the construction of which could cause <br /> significant environmental effects? <br />D. Are sufficient water supplies available to serve the ^ ^ ® ^ <br /> project from existing entitlements and resources or <br /> are new or expanded entitlements needed? <br />E. Result in the determination by the wastewater ^ ^ ® ^ <br /> treatment provider which serves or may serve the <br /> project that it has adequate capacity to serve the <br /> project's projected demand in addition to the <br /> provider's existing commitments? <br />3 ~a~ 6 ~38 <br />