Laserfiche WebLink
COMMONWEALTH AUDI <br />1425 AUTO MALL DRIVE <br />MITIGATION MONITORING PLAN <br />ENVIRONMENTAL REVIEW NO. 2007-60 <br />MITIGATION MEASURE AGENCY APPROVAL <br />Prior to issuance of Grading Permit and during construction <br />• During construction, the contractor Public <br />shall comply with SCAQMD Fugitive Dust Works <br />Rule 403 to suppress dust generated by <br />construction operations. To ensure <br />compliance with SCAQMD Fugitive Dust <br />Rule 403, grading plans and demolition <br />plans for the proposed project shall <br />reflect the following notes: <br />o All material excavated or graded <br />will be sufficiently watered to <br />prevent excessive amounts of dust. <br />o All clearing and earthwork <br />activities shall cease during period <br />of high winds (winds greater than 25 <br />mph averaged over one hour) or <br />during Stage 1 or Stage 2 smog <br />episodes. <br />o Streets surrounding the project site <br />shall be cleaned at the end of each <br />day of construction. <br />o All material transported offsite <br />shall either be sufficiently watered <br />or securely covered to prevent <br />excessive amounts of dust. <br />o The amount of area disturbed by <br />clearing and earthwork activities <br />shall be minimized at all times. <br />o Equipment engines shall be <br />maintained in good condition and in <br />proper tune according to <br />manufacturer's specifications. <br />Pa~ ~`T7 <br />