My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - SPR 2008-03 1425 AUTO MALL DR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
07/07/2008
>
31B - SPR 2008-03 1425 AUTO MALL DR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:30:05 PM
Creation date
7/2/2008 11:27:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31B
Date
7/7/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. All material transported offsite shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br />e. The amount of area disturbed by clearing and earthwork activities shall be <br />minimized at all times. <br />f. Equipment engines shall be maintained in good condition and in proper <br />tune according to manufacturer's specifications. <br />g. To the extent feasible, gasoline powered equipment shall be used for <br />onsite and offsite construction activities. <br />2. The project developer shall provide proof of coverage under NPDES General <br />Construction Activity Storm Water Permit that includes: (a) A copy of the project's <br />permit issued by the State Water Resource Control Board that identifies the <br />permit number; and (b) Two copies of the Storm Water Pollution Prevention Plan. <br />3. Submit and have approved a surface drainage/utility plan that depicts all <br />applicable "Site Design" structural "Source Control" and "Treatment Control" Best <br />Management Practices (BMPs) in accordance with the Orange County Drainage <br />Area Management Plan (DAMP) and the City of Santa Ana Local Implementation <br />Plan (LIP). <br />4. Submit for approval a surface drainage/grading/erosion control plan. The plan is <br />to include existing and proposed elevations at and adjacent to all property lines. <br />Drainage routed to the street must be directed beneath the sidewalk and through <br />the curb. <br />5. The project developer shall provide proof of coverage under NPDES General <br />Construction Activity Storm Water Permit that includes: (a) A copy of the project's <br />permit issued by the State Water Resource Control Board that identifies the <br />permit number; and (b) Two copies of the Storm Water Pollution Prevention Plan. <br />6. Prior to issuance of grading permits, the project developer shall submit and have <br />approved a surface drainage/utility plan that depicts all applicable Site Design, <br />Structural Source Control and Treatment Control Best Management Practices in <br />accordance with the Orange County Drainage Area Management Plan (DAMP) <br />and the City of Santa Ana Local Implementation Plan (LIP). <br />7. Provide an electronic copy of the "Water Quality Management Plan" (WQMP) <br />that includes the following: <br />a. Site Assessment. <br />b. Site design Best Management Practices (BMP). <br />Resolution No. 2008-19 <br />Page 5 of 6 <br />31 B-54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.