My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERVAL HOUSE 11 - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
INTERVAL HOUSE 11 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 5:03:27 PM
Creation date
7/22/2008 10:15:05 AM
Metadata
Fields
Template:
Contracts
Company Name
INTERVAL HOUSE
Contract #
A-2008-068-03
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
4/7/2008
Expiration Date
6/30/2009
Insurance Exp Date
10/1/2008
Destruction Year
2016
Notes
COMPLETION DATE 06-30-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reducing Lead Hazards In The Home <br />Always use a <br />professional who <br />is trained to <br />remove lead <br />hazards safely. <br />In addition to day-to-day cleaning and good <br />nutrition: <br />You can temporarily reduce lead hazards <br />by taking actions such as repairing dam- <br />aged painted surfaces and planting grass <br />to cover soil with high lead levels. These <br />actions (called "interim controls") are not <br />permanent solutions and will need ongo- <br />ing attention. <br />To permanently remove lead hazards, <br />you should hire a certified lead "abate- <br />ment" contractor. Abatement (or perma- <br />nent hazard elimination) methods <br />include removing, sealing, or enclosing <br />lead-based paint with special materials. <br />Just painting over the hazard with regular <br />paint is not permanent removal. <br />Always hire a person with special training <br />for correcting lead problems—someone <br />who knows how to do this work safely and <br />has the proper equipment to clean up <br />thoroughly. Certified contractors will employ <br />qualified workers and follow strict safety <br />rules as set by their state or by the federal <br />government. <br />Once the work is completed, dust cleanup <br />activities must be repeated until testing <br />indicates that lead dust levels are below the <br />following: <br />40 micrograms per square foot (ug/ft2) <br />for floors, including carpeted floors; <br />250 pg/ft2 for interior windows sills; and <br />400 pg/ft2 for window troughs. <br />Call your state or local agency (see bottom <br />of page 11) for help in locating certified <br />professionals in your area and to see if <br />financial assistance is available. <br />Attachment 11 Page of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.