Laserfiche WebLink
Notice of Availability Utility Study <br />Notice of Determination Traffic Study <br />Air Quality Study Mitigation Monitoring Program <br />Noise Impact Study Preparation of Response to Comments <br />Biological Study Preparation of Statement of Overriding <br />. Considerations <br />Cultural Resources Study FAA and ALUC Required <br />5.0 Quanty Control <br />Templeton Planning Group strives to provide an error -free work product consistent with our <br />reputation for excellence and our desire to give clients the highest quality environmental <br />documents. Where possible, we build off of our extensive library of documents that have <br />withstood public and legal scrutiny, to maximize thoroughness and accuracy while minimizing <br />costs. <br />Templeton Planning Group has built strong relationships with reputable consulting firms <br />throughout Southern California. In addition to relying on quality sources, technical studies <br />provided by subconsultants and our environmental documents are scrutinized by the Director of <br />Environmental Services and Templeton Planning Group staff to ensure that all analyses are <br />relevant, thorough, accurate, and comprehensive. <br />6.0 Timely Completion of Projects <br />' At Templeton Planning Group, we have an on -going policy to only to take on projects to which <br />we can dedicate 100% of our efforts. We fulfill our commitment to meeting deadlines by <br />communicating clearly and often with the project team, including City staff and the applicant and <br />his consultants, where appropriate. In the event that a schedule is delayed, we would redistribute <br />our resources. With our efficient and comprehensive staff, we can mobilize quickly to meet <br />deadlines. Internal staff meetings with and between our subconsultants along with team <br />meetings with the City can be used to ensure timely delivery of work products. If necessary, and <br />with permission of the City, we can draw on our consultant base to supplement our team. In our <br />experience it typically takes approximately 10-12 months to complete the EIR process and <br />M approximately 6 months to complete the ND process. <br />City of Santa Ana SOQ 12 Templeton Planning Group <br />