My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ULTRASYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
U-V (INACTIVE)
>
ULTRASYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:44:52 PM
Creation date
8/6/2008 11:13:32 AM
Metadata
Fields
Template:
Contracts
Company Name
ULTRASYSTEMS
Contract #
A-2008-140
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
10/27/2008
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UltraSystems <br />environmental. manage menteplanning <br />April 11, 2008 <br />Mr. Pedro Guillen, Associate Planner <br />City of Santa Ana <br />Planning Division, M-20 <br />20 Civic Center Plaza <br />Santa Ana, California 92702 <br />Subject: Statement of Qualifications for On -Call Environmental Services <br />Dear Mr. Guillen: <br />UltraSystems Environmental, Inc. (UltraSystems) is excited at the opportunity to submit our qualifications to be <br />considered for providing On -Call Environmental Services to the City of Santa Ana (City). The UltraSystems Team <br />has been selected to provide the appropriate expertise and support for upcoming projects with the City. <br />We are confident that the Ultrasystems Team is well -prepared to meet the needs of the City by dedicating a project <br />team composed of individuals with the requisite technical experience to effectively perform and manage all <br />contractual requirements. We can ensure the City that our current and anticipated workload is such that we will be <br />able to perform the necessary project tasks in a timely and cost-effective manner. <br />Our excitement and confidence stems from a track record of successfully completing nearly 4,000 environmental <br />documents and technical studies for public and private sector clients throughout California since the founding of the <br />firm in 1994. Our goal as the City's environmental consultant is to serve the needs of the City by assessing <br />potential environmental impacts of all proposed projects and associated construction operations, and by developing <br />well-defined technical studies and comprehensive environmental assessments to determine the most appropriate <br />environmental document. <br />UltraSystems will serve as the Prime consultant for the duration of the contractual period with the City. However, <br />to supplement our services for project management, air quality, noise, biological resources, and hazardous materials <br />resources, UltraSystems has teamed with two specialty firms: PacRim Engineering for geology/soils, hydrology, <br />and traffic and transportation issues, and ArchaeoPaleo Resource Management, Inc. for cultural and historical <br />resources. <br />In our efforts to provide the City with unsurpassed quality services, UltraSystems has designated the most qualified <br />and experienced professional staff members to provide On -Call Environmental Services. As Principal -in -Charge, I <br />will be responsible for all contractual negotiations, QA/QC Program review, and the coordination of administrative <br />resources. <br />Corporate Office — Orange County <br />100 Pacifica <br />Suite 250 <br />Irvine, CA 92618-7443 <br />Telephone: 949.788.4900 <br />Facsimile: 949.788.4901�' ° r��1( y <br />Website: www.ultrasystems.com .--, <br />
The URL can be used to link to this page
Your browser does not support the video tag.