| STATEMENT OF QUALIFICATIONS TO THE CITY OF SANTA ANA 
<br />TO PROVIDE ENVIRONMENTAL CONSULTANT SERVICES 
<br />ON AN AS -NEEDED BASIS 
<br />ULTRASYSTEMS REFERENCE NO. 080337 
<br />difference, and analytical modeling solutions to design groundwater remediation programs and to assess groundwater 
<br />resources. 
<br />Mr. Herlihy has prepared written ISO 14001 environmental management system documents for manufacturing facilities. 
<br />He has implemented programs for Publicly -Owned Treatment Works (POTW) discharge monitoring, air monitoring, 
<br />recordkeeping and routine reporting. Mr. Herlihy prepared Business Emergency Plans, Hazardous Waste Contingency 
<br />Plans, Chemical Hygiene Plans, Lockout Tagout Programs, Hazard Communication Programs, Hearing Conservation 
<br />Programs, Injury Illness and Prevention Plans (IIPP), Medical Surveillance Programs, Respiratory Protection Programs, 
<br />Hazardous Waste Source Reduction Plans, Tiered Permitting Programs, and Storm Water Pollution Prevention Plans 
<br />(S WPPP). He has prepared required reports including: Biennial Hazardous Waste Reports, annual Toxic Chemical Release 
<br />Inventory Reports, Pre -Manufacture Notices, and Annual Emissions Reports. He has provided Hazardous Waste 
<br />Operations and Emergency Response (HAZWOPER), DOT Hazardous Waste Handlers, and OSHA safety training, and he 
<br />has acted as regulatory affairs liaison for manufacturing facilities. 
<br />Peter Liu, P.E.: Traffic/Transportation, Project Involvement: 40% 
<br />The engineering support will be led by Mr. Peter Liu, P.E. of PacRim Engineering. Mr. Liu is an accomplished project 
<br />manager with more than 24 years of experience in the field of civil engineering. During his professional career, he has led 
<br />cross -functional teams to execute multi -disciplinary projects in infrastructure, transportation, public works, building 
<br />facilities, and architecture for a wide range of government clients and private customers. He understands a civil 
<br />engineering project from initial conception, programming, preliminary design and final engineering, to the eventual 
<br />construction through various federal and local funding processes and environmental clearances. For the City of Santa Ana, 
<br />Mr. Liu recently led the engineering design of several public works projects including: the Second Street Fountain Project, 
<br />the Santa Ana Zoo Restroom Renovation, the Eddie West Stadium Improvements, and the Civic Center Pedestrian Bridge 
<br />Rehabilitation. He has demonstrated to the City his ability to work with City staff, understands City standards and 
<br />procedures, and executes City projects on -time and within budget. 
<br />Roy Kim is a Principal at PacRim Engineering. He will assist in conducting public outreach efforts and program pursuits. 
<br />Mr. Kim has developed a broad understanding of governmental agencies in California. A community services veteran of 
<br />over 13 years in Orange County, he served as an officer at the Assistant Vice Chancellor's office at the University of 
<br />California, Irvine, funding, organizing and directing a broad range of educational, social and community programs with 
<br />numerous governmental and private entities. He is experienced in the full spectrum of community services including 
<br />strategic planning, program budgeting, organization, direction and operation of various programs, implementation of 
<br />facility improvements, human resources development, and external communications. 
<br />Mr. William Hsueh, P.E., is a Project Manager at PacRim, with over 10 years of experience in civil engineering. He will 
<br />be responsible for Hydrology, Water Quality and Utility Studies. He has been involved in the project management and 
<br />design of major residential communities in Orange, Riverside and San Bernardino Counties in recent years. Mr. Hsueh's 
<br />main designs include rough and precise grading, street improvements, sewer and water plans, retaining wall plans, master 
<br />site plans, and tentative maps. Mr. Hsueh performed the hydraulic studies, utility coordination, and the processing of 
<br />regulatory permits from the Army Corps of Engineers, the State Regional Water Quality Control Board, and the California 
<br />Department of Fish and Game for the Riverside Drive Bridge Over the Los Angeles River project. 
<br />Mr. Fong -Ping Lee, Ph.D., P.E., T.E. established FPL and Associates, Inc. (FPL) in 1988. He has led the firm to provide 
<br />traffic and civil engineering for various development, public works, freeway, and municipal transportation projects. FPL 
<br />performed a traffic analysis as part of the CEQA/NEPA document to address the benefits of widening the First Street Over 
<br />the Los Angeles River Viaduct to mitigate the proposed Eastside LRT project. He presented the VISSIM simulation model 
<br />to show the light rail operation on signalized streets with or without bridge widening. FPL also completed a large collection 
<br />of traffic data of ADT and intersection turn movements of the airport circulation to facilitate the Ontario Airport security 
<br />analysis. FPL performed traffic analysis (HCS method) to evaluate the Level of Service for various geometric scenarios for 
<br />the SANBAG I-IO/Cherry Interchange Improvement PSR/PR, and for the Riverside County Newport Road and Scott Road 
<br />Improvement PSR. FPL prepared a Traffic Management Plan (TMP) for the OCTA I-405/SR-73 interchange improvement 
<br /> |