Laserfiche WebLink
<br />FUNDING ANALYSIS <br />PROJECT 08-3212 <br />CONCORD STREET BLOCK WALL AT CAMBRIDGE RESERVOIR <br /> <br />Construction Contract <br />Contract Administration <br />Inspection and Testing <br />Survey Staking <br />Contingencies <br /> <br />$52,922 <br />$1,486 <br />$5,000 <br />$4,000 <br />$5,292 <br /> <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br /> <br />$68,700 <br /> <br />Exhibit 2 <br /> <br />23A-4 <br />