Laserfiche WebLink
<br />DOTY BROS. <br />Construction Company <br /> COST PLUS RATES <br /> SOUTHERN CAUFORNIA <br /> COST PLUS RATES EFFECTIVE JULY 1,2008 TO JUNE 30, 2009 <br /> PAY STRAIGHT OIlER DOUBLE PAY STRAIGHT OVER DOUBLE <br />CRAFTSMANlCLASS CODE TIME TfME TfME CRAFTSMANlCLASS CODE TIME TIME TIllE <br />CARPENTERS OPERA TINO ENGINEERS <br />General Foreman CGF 8562 121.78 157.93 Gen~IFo~,Ap~.A ooF 91.63 126.80 161.97 <br />Operating Foreman COF 80.32 113.82 147.32 Foreman. Appdx. A OFM 88.29 121.79 155.29 <br />Foreman CFM 80.62 114.27 147.92 Group 1, Appdx. A - Oiler 001 80.13 109.56 136.98 <br />Joume~an CJM 75.62 106.n 137.92 Group 2, Appdx. A . OUer 002 81.44 111.51 141.58 <br />Sh ingler CSJ 75.63 107.09 138.35 Group 6, Appdx. A - Universal 0G8 84.96 116.79 146.62 <br />Apprentice. 8th Period (90%) CA8 69.39 97.42 125.46 Group 10, Appdx. A. Mechanic OGA 85.16 117.09 149.02 <br /> Group 8. Appdx. B - Crane < 25 TOII$ 0B8 85.44 117.51 149.59 <br />MILLWRIGHTS Group 9. Appdx. B . Crane> 25 Tons 089 85.72 117.94 150.16 <br />General Foreman CMG 86.46 123.03 159.60 Appl'lln1lce, Grp 8, Appdx A . Step 6 (90%) OA6 78.59 107.24 135.89 <br />Foreman CMF 81.45 115.52 149.59 <br />Joume~an CMJ 76.45 108.02 139.58 <br />Apprentice - 8th Period (95%) CM8 66.98 93.81 120.64 UA. PIPEFlTTERSlWELDERS <br /> INDUSTRIAL <br /> General Foreman IGF 94.98 129.68 164.38 <br />CEMENT MASONS Foreman IFM 89.09 121.02 152.94 <br />Foreman MFM 75.86 102.13 128.41 Journeyman. Welder/Frtter IJM 80.25 108.01 135.78 <br />Joumeyman MJM 72.53 97.13 121.73 Apprentice. Fifth Year IA5 67.68 92.67 117.65 <br />F & T l\Aachine Operator MTO 72.94 97.76 122.57 <br />Apprentice. 8th 6 Mos. (90%) MA8 67.61 89.75 111.89 SHORTlINE (LOCAL 250) <br /> Foreman SFM 93.31 129.90 163.68 <br />LABORERS Journeyman (WelderlFitter) SJM 90.31 125.40 157.75 <br />Operator General Foreman LOG 88.76 123.93 159.10 Welder Helper SWH 50.30 68.50 85.65 <br />Operator Foreman LOF 85.43 118.93 152.43 Pre-Helper SPH 29.96 41.02 52.08 <br />General Foreman LGF 71.35 97.81 124.28 <br />Foreman LFM 69.68 95.31 120.94 <br />Group 1 - General LGl 62.34 84.30 106.26 <br />Group 2. Wrapper To 6" LG2 63.26 85.68 108.10 UTlUTY <br />Group 3 - PTOM'rapper> 6" lG3 64.18 87.05 109.93 Foreman UFM 63.47 69.04 113.29 <br />Group 4 . Pipe la1'8'". C&S LG4 66.76 90.93 115.10 Welder UWD 61.21 82.85 104.48 <br />Group 5 . Blaster LG5 67.35 91.81 116.27 JoumeymanlFuser UJM 52.57 70.31 88.04 <br />Apprentice.6th Period (85%) LA6 51.63 72.42 93.22 Pipe Tradesman II UP2 40.22 51.89 63.57 <br />TEAMSTERS ELECTRICIANS I INSIDE WIREMEN <br />Operator Ger.al Foreman TOG 93.86 129.03 164.20 (RaIN sUbJeel to project IoclltloR & employee bue Iocldionl <br />Operator Foreman TOF 90.53 124.03 157.53 Ger.al Foreman EGF 97.65 136.91 176.17 <br />General Foreman TGF 72.63 97.16 121.74 Foreman EFM 90.42 126.06 161.70 <br />FOrBman TFM 70.96 94.68 118.40 Journeyman EJM 83.18 115.20 147.22 <br />Group 2 - 2 Axle TG2 67.88 90.05 112.23 Apprentice - 10th Period (85%) EAO 7207 99.29 12(j,51 <br />Group 3 - 3 Axle TG3 68.09 90.38 112.66 <br />Group 5. Worlling Truck Driver TGS 68.46 90.93 113.40 PROJECT MANAGEMENT <br />Group 6 . 4 Of More Axle TOO 68.51 91.00 113.50 Project Manager MPM 106.33 145.45 187.85 <br />Group 9 . Ll>-Bed TG9 69.68 92.76 115.83 Superintendent MSP 95.40 130.02 167.93 <br />Group 12 - WTD BoomTrk Cart TBT 71.73 95.83 119.94 ~t Engineer MPE 74.04 108.37 142.70 <br /> <br />Apprentice Rat..: Apprentice rates as listed above are the highest classification prior to journeyman full scale rates. Billing rate for Apprentice will be based on <br />actual classification. <br />Subsistence: $85.OOIday <br />Travel Time: Customer will be advised if travel time is applicable <br /> <br />OvertJme Rilt..: All hours outside regularly constituted shift shall be time and one half. Sundays and holidays shal be paid at double time. FOf Operating <br />Engineers. first four (4) hours outside regular shift, and first twelve (12) hours on Saturday is time and one half; all additional hours at double lime except holidays <br />which are at triple time. Emergency -callout work-. Four (4) hour minimum for labor and equipment. <br /> <br />Markup: Material, subcontractors, subsistence. and outside rentals (including fuel costs), will be billed cost plus sales tax where applicable. plus mark-up of 15% <br />Boundarl.. of Southem Callfomla Caet Plus Rat..: consists of the eleven (11) counties of Los Angeles, Inyo, Mono. Orange, Riverside. San Bernardino, <br />Imperial, Ventura, Santa Samara, San Luis Obispo. Kem and in addition: Richardson Rock, Santa Cruz Island, Arch Rock. San Nicholas Island, Catalina Island, San <br />Clemente Island, San Mguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, including the Channel Islands Monument. Rate Scale does not <br />include San Diego County. <br /> <br />NOTE: Wage sealH are In accordance with Anoclated General Contractors Muter Lsbor Agreement. and are subject to change without notice. This <br />rate sheet Is not a1llncluslw; additional c1asslflcatlons available If required. (v2.0) CA C.L. 273024 <br /> <br />11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (5~ g~~~,: (562) 864-6052 www.dotybros.eom CA Lie. 273024 <br />