My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - ON CALL SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
08/18/2008
>
25E - ON CALL SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:57 PM
Creation date
8/12/2008 5:53:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
8/18/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Paulus Enl!ineerint!. Inc. <br /> <br />TIME & MATERIAL WORKSHEET <br /> <br />Customer. <br />Work Authorized by. <br />DescriiJlion <br /> <br />Project: <br />Work Date: <br />Foreman: <br /> <br />TMNo. <br />Job No. <br /> <br />QTY I LABOR lREG HRslOfT HRSI REG RATE I on RATE I REG TOTAL I on TOTAL <br /> laborer $ 52.00 $ 78.00 $ $ <br /> Pipelayer $ 58.00 $ 87.00 $ $ <br /> Operator $ 66.00 $ 99.00 $ $ <br /> Truck Driver $ 66.00 $ 99.00 $ $ <br /> Foreman $ 78.00 $ 117.00 $ $ <br /> Superintendent $ 95.00 $ 142.50 $ $ <br /> Subtotal $ $ <br /> Mark Up 0/. 15% $ $ <br /> TOTAL $ $ <br />QTY I BARE EQUIPMENT AMT. I I UNIT I TOTAL <br /> Cat 345 Excavator HR $ 150.00 $ <br /> Compaction Wheel HR $ 35.00 $ <br /> Hitachi 4001450 Excavator HR $ 150.00 $ <br /> Compaction Wheel HR $ 35.00 $ <br /> Cal240/33O-Yulani 320 Excavator HR $ 120.00 $ <br /> Compaction Wheel HR $ 35.00 $ <br /> Cat 962 Wheel Loader HR $ 115.00 $ <br /> Cat 950 Wheel Loader HR S 95.00 $ <br /> Lowbed Tractorrrrailer HR $ 90.00 $ <br /> Cat Backhoe HR $ 70.00 $ <br /> Compacllon Wheel or Breaker HR $ 25.00 $ <br /> Boom Truck HR $ 38.00 $ <br /> 10 Wheel Dump Truck HR $ 52.00 $ <br /> 6 Wheel Dump Truck HR $ 43.00 $ <br /> 6 Wheel Flat Bed Truck HR $ 30.00 $ <br /> Walef Truck HR $ 45.00 $ <br /> Crew Truck with Tools HR $ 36.00 $ <br /> Delivery Truck HR $ 30.00 $ <br /> $ <br /> Mise Tools <br /> Shoring Jacks - per each Day $ 12.00 $ <br /> Trench Plates - per each Day $ 12.00 $ <br /> Trench Shield Day $ 106.00 $ <br /> Manhole ShIeld Day $ 90.00 S <br /> 3" Pump w/Conneclors Day $ 105.00 $ <br /> Generator Day $ 80.00 $ <br /> Air Compressor Day $ 125.00 $ <br /> Air Blower Day $ 6500 $ <br /> Confined Space Equipment Day $ 750.00 $ <br /> Gas Deteellon Equipment Day $ 65.00 $ <br /> Trafflc Arrow Board Day $ 200.00 $ <br /> T raffoc Barricades Day $ 2.00 $ <br /> T raft'lC Cones/Delineators Day $ 2.00 $ <br /> Walk Behind Vibratory Plate Day $ 80.00 $ <br /> Mise Small Tools Day $ 75.00 $ <br /> Subtotal $ <br /> Mark Up "I. 15% $ <br /> TOTAL $ <br />AMT MATERIAL, SUBCONTRACT, MiSe Unit I TOTAL <br /> $ <br /> $ <br /> $ <br /> $ <br /> $ <br /> $ <br /> $ <br /> $ <br /> $ <br /> $ <br /> Subtotal $ <br /> Mark Up % 15% $ <br /> TOTAL $ <br /> Total Overhead / Profit $ <br /> TOTAL WORKSHEET $ <br /> <br />25E-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.