Laserfiche WebLink
DOTS BROS. <br />Construction Company <br />COST PLUS RATES <br />30UTHERN CALIFORNIA <br />COST PLUS RATES EFFECTIVE JULY 1, 2008 TO JUNE 30, 2409 <br /> PAY STRAIGHT OVER DOUBLE PAY STRAIONT OVER DOUBLE <br />CRAFTSMAN/CLASS CODE TIME TIME TIME CRAFTSMAIY/CLASS CODE TIME TIME TIME <br />CARPENTERS OPERATfNO ENOl11tEERS <br />General Foreman CGF 85.62 121.78 157.93 General Foreman, Appdx. A OGF 91.63 126.80 161.97 <br />Operating Foreman COF 80.32 113.82 147.32 Foreman, Appdx. A OFM 88.29 121.79 155.29 <br />Foreman CFM 80.62 114.27 147.92 Group 1, Appdx, A -Oiler OGi 80.13 109.56 138.98 <br />Journeyman CJM 75.62 106.77 137.92 Group 2, Appdx. A -Oder OG2 81.44 111.57 141.58 <br />Shinglar CSJ 75.83 107.09 138.35 Group 8, Appdx. A -Universal OG8 84.96 116.79 148.62 <br />Apprentice -8th Period (9096} CA8 69.39 97.42 125.46 Group 10, Appdx. A -Mechanic OGA 65.16 117.09 149.02 <br /> Group 8. Appdx. B -Crane < 25 Tons OB8 85.44 117.51 149b9 <br />MILLWRIGHTS Group 9. Appdx. B -Crane > 25 Tons 089 85.72 117.94 150.16 <br />General Foreman CMG 86.46 123.03 159.60 Apprentlee, Grp 8, Appdx A -Step 6 (90%) OA6 78.59 107.24 135.89 <br />Portman CMF 81.45 115.52 149.59 <br />Journeyman CMJ 76.45 108.02 139.58 <br />Apprentice - 8th Period (95%) CM8 66.98 93.81 120.64 U.A. PIPEFITTERS/WELDERS <br /> INDUSTRIAL <br /> General Foreman lGF 94.98 129.68 164.38 <br />CEMENT MASONS Foreman IPM 89.09 121.02 152.94 <br />Foreman MFM 75.86 102.13 128.41 Journeyman - WeldedFitter WM 80.26 108.01 135.78 <br />Journeyman MJM 72.53 97.13 121.73 Apprerrtice -Fifth Year V15 67.68 92.67 117.65 <br />F3T Machine Operator MTO 72.94 97.76 122.57 <br />Apprentice - 8th 6 Mos. (9096) MAB 67,61 89.75 111.89 SHORTLINE (LOCAL 250) <br /> Foreman SFM 93.31 129.90 163.68 <br />LABORERS Journeyman (Wakier/Fitler) SJM 90.31 125.40 157.75 <br />Operator General Foreman LOG 88.76 123.93 159.10 Welder Helper SWH 50.30 68.50 85.85 <br />Operator Foreman LOF 85.43 118.93 152.43 Pro-Helper SPH 29.98 41.02 52.08 <br />General Foreman LGF 71.35 97.81 124.28 <br />Foreman LFM 69.68 95.31 120.94 <br />Group 1 -General LG1 62.34 84.30 106.26 <br />Group 2 -Wrapper To 6" LG2 63.26 85.68 108.10 UTfLiTY <br />Group 3 - PTO/Wrepper> 6" LG3 64.18 87.05 109.93 Foreman UFM 63.47 89.04 113.29 <br />Group 4 -Pipe layer, CrI~S LG4 66.76 90.93 115.10 Welder UWD 61.21 82.85 104.48 <br />Group 5 -Blaster LG5 67.35 91.81 116.27 JotxneymaNFuser UJM 52.57 70.31 68.04 <br />Apprentice - 6th Period {85%) LAfi 61.63 72.42 93.22 Pipe Tradesman li UP2 40.22 51.89 63.57 <br />TEAMSTERS ELECTRICIANS / JNSIDE WIREMEN <br />Operator General Foreman TOG 93.86 129.03 164.20 (Babes subject to project lacatbn a MnPbyss bass location) <br />Operator Foreman TOF 90.53 124.03 157.53 General Foreman EGF 97.65 136.91 176.17 <br />General Foreman TGF 72.63 97.18 121.74 Foreman EFM 90.42 126.06 161.70 <br />Foreman TFM 70.96 94.68 116.40 Journeyman EJM 83.18 115.20 147.22 <br />Group 2 - 2 Axle TG2 67.88 90.05 112.23 Apprentice -10th Period {8596) EAO 72.07 99.29 126.51 <br />Group 3 - 3 Axb TG3 68.09 90.38 112.66 <br />Group 5 - Working Tnrclc privet TGS 68.46 90.93 113.40 PROJECT MANAGEMENT <br />Group 6 - 4 or Mora Axle TG6 68.51 91.00 113.5p Project Manager MPM 106.33 145.45 187.85 <br />Group 9 - Lo-Bed TG9 69.68 92.76 115.83 Superintendent MSP 95.40 130.02 167.93 <br />Group 12 - WTD BoomTrk Cert TBT 71.73 96.83 119.94 Project Engineer MPE 74.04 108.37 142.70 <br />Apprentice Rater. Apprentlce rates as listed above are the highest classification prior to journeyman full scale rates. Billing rate torApprontice will lie based on <br />actual classification. <br />Subsistence: S85.OO/day <br />TrevN Tlrns: Customer will be advised 'd trevel time Lt applicable <br />Overtlms Rates: AN hours outside regularly constkuted shift shall txa time and one half. Sundays and holidays shag be paid at double time. For Operating <br />Engineers -first four (4} boon outside regular shift, and first twelve (12) hours on Saturday is time and one haN; all add'Rionai hours at double lima except hoNdays <br />which are at triple time. Emsrysncy'WI out work' -Four (4) hour minimum fa tabor and equipment. <br />Markup: Material, subcontractors, subsistence, and outside rentals (including fuel costs), wr7l be billed cost plus sales tax where applicable, plus mark-up of 15% <br />Boundaries of Southern CalHomla Cost Plus Ratty: consists of the eleven (11) counties of Los Angeles, Inyo, Mono, Orange, Riverside, San Bernardino, <br />Imperial, Ventura, Santa Barbara, San Luis Obispo, Kem and in addition: Richardson Rack, Santa Cruz Island, Arch Rode, San l~cholas Island. Catalina Island, San <br />Clemente Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, inGudirg the Channel Islands Monument. Rate Scale does not <br />indude San Diego Counly. <br />NOTE: Wsgro scales are in accordance wttlt Assodatsd Gsrwral Contractors Mashr Labor Agreement, and are subject to thongs without notice. This <br />rate sheet is not all Inelushrr addklonsl dassiflcatiom available if required. (v2.0) CA C.L. 273024 <br />11232 E. Firestone Blvd., Norwalk, CA 90650 Phoae: (56~ $¢~¢56~ Fes: (562) Sti4-6052 www.dotybros.com CA Lic. 273024 <br />