Laserfiche WebLink
PBUIUS Englneerm riC 71ME & MATERIAL WORKSHEET TM No. <br />Job No. <br />Customer. <br />Work Authorized by: <br />Descriptio7r <br />Pro/act: <br />Work Date: <br />Foreman: <br />QTY LABOR REG HR Ort HRS REG RATE O7T RATE REG TOTAL 01T 10TAL <br />taborer $ 52.00 $ 78.00 $ - $ - <br />Pipelayer $ 58.00 $ 87.00 $ - $ - <br />Operator $ 66.00 $ 99.00 $ - $ - <br />Truck Driver $ 66.00 $ 99.00 $ - $ - <br />Foreman $ 78.00 $ 117.00 $ - $ - <br />Superintendent $ 95.00 $ 142.50 $ - $ - <br /> Subtofal $ $ - <br /> <br />TOTAL $ $ <br />QTY BARE EQUIPMENT AMT. UNIT TOTAL <br />Cat 345 Excavator HR $ 150.00 $ - <br />Compactlon Wheel HR $ 35.00 $ - <br />Hltachi 400/450 Excavator HR $ 150.00 E - <br />Compactlon Wheel HR $ 35.1X1 $ - <br />Cat 240!330-Vulani 320 Excavator HR $ 120.00 $ - <br />Compaction Wheel HR $ 35.00 $ - <br />Cat 962 Wheel Loader HR $ 115.00 $ - <br />Cat 950 Wheel Loader HR $ 95.00 $ - <br />Lowbed Tractorfftaller HR $ 90,00 E - <br />Cat Backhoe HR $ 70.00 $ - <br />Compactlon Wheel or Breaker HR $ 25.00 $ - <br />Boom Truck HR $ 38.00 $ - <br />10 Wheel Dump Truck HR $ 52.00 $ - <br />6 Wheel Dump Truck HR $ 43.00 $ - <br />BWheel Flat Bed Truck HR $ SO.QO $ - <br />WaterTruck HR $ 45.00 $ - <br />Crew Truck with Tools HR $ 38.00 $ - <br />Delivery Truck HR $ 30.00 $ - <br /> $ - <br />Misc Tools <br />Shoring Jacks -per each Day $ 12.00 $ - <br />Trench Plates -per each Day $ 12.00 $ - <br />Trench Shield Day $ 108.00 $ - <br />Manhote Shield Day $ 90.00 S - <br />3" Pump wlConnectors Day $ 105.00 $ - <br />Generator Day $ 80.00 $ - <br />Alr Compressor Day $ 125.00 $ - <br />Atr Blower Day $ 65.00 $ - <br />Conflrted Space Equipment Day $ 750.00 $ - <br />Gas DeteUbn Equipment Day $ 65.00 $ - <br />Trafflc Arrow Board Day $ 200.00 $ - <br />Traffic Barricades Day $ 2.00 $ - <br />Traific Coneslpelineatars Dey $ 2.00 $ - <br />Walk Behind Vltxatory Plate Day $ 80.00 $ - <br />Mlsc Small Tools Day $ 75.00 $ - <br /> Subtotal $ - <br /> Mark Up % 15y. $ - <br />TOTAL $ <br />AMT MATERIAL, SUBCONTRACT, MISC Unk TOTAL <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />$ - <br />$ - <br />Subtotal $ - <br />Merk Up Y• 15% $ - <br />Total Overhead !Profit <br />TOTAL $ <br />TOTAL WORKSHEET S - <br />25E-30 <br />