Laserfiche WebLink
July 16, 2008 <br />CITY OF SANTA ANA <br />220 S. Daisy Ave., M-85 <br />P.O. Box 1988 <br />Santa Ana, CA 92702 <br />Attn: Mr. Thom Loughran <br />Water Resources Manager <br />Re: Labor and Equipment Rates <br />Description Rates <br />LABOR RATES <br />Two Man Crew $ 120.00 <br />Three Man Crew $ 176.02 <br />Four Man Crew $ 236.35 <br />Additional Man $ 58.77 <br />Additional Operator $ 64.29 <br />Two Man Crew (OT) $ 151.53 <br />Three Man Crew (OT) $ 235.11 <br />Four Man Crew (OT) $ 303.99 <br />Additional Man (OT) $ 74.98 <br />Additional Operator (OT) $ 82.04 <br />EQUIPMENT RATES <br />CAT 446 416, 426, 428, 436 Backhoe $ 127.61 <br />Delivery Truck $ 47.38 <br />CAT 325 Excavator, or equal $ 205.72 <br />Linkbelt RT Crane $ 192.71 <br />Kawasaki 80Z, 65Z Loader $ 130.21 <br />Vacmaster Pothole Truck $ 130.00 <br />Lowbed $ 130.83 <br />Lowside End Dump $ 109.01 <br />Ten Wheel Dump $ 101.51 <br />Bob tail Dump Truck $ 86.84 <br />Water Truck $ 75.90 <br />Asphalt Roller $ 136.00 <br />Skiploader $ 98.61 <br />Concrete Saw $ 142.10 <br />8' x 20' Shield (Daily) $ 150.00 <br />4' x 20' Shield (Daily) $ 125.00 <br />Light Plant (Daily) $ 233.94 <br />Arrow Board (Daily) $ 170.13 <br />Compaction Wheel (Daily) $ 248.46 <br />Addco Message Board (Daily) $ 304.34 <br />MATERIAL <br />Material at Cost plus 15% <br />Dump Fees at Cost plus 15% <br />25E-43 <br />