My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - LANDSCAPE SA ZOO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
09/02/2008
>
25H - LANDSCAPE SA ZOO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:28:15 PM
Creation date
8/25/2008 2:31:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
9/2/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 23 of 41 <br /> <br />4) Emergency Service <br /> <br />a. Twenty-four hours per day, seven days per week, the Contractor <br />shall be able to receive and respond to the City's call for <br />emergency service. Response time shall be less than two hours to <br />remove or eliminate a public safety hazard. Contractor shall <br />provide the City with a local telephone number where Contractor <br />can be contacted twenty-four hours per day, seven days per week. <br /> <br />13) New Maintenance Areas <br /> <br />a. Additional routine maintenance may be added to this contract. <br />Payment for add-on maintenance shall be computed on a square <br />foot cost per the bid. <br /> <br />14) Arterial Sidewalk Maintenance <br /> <br />a. Contractor shall remove weeds in the sidewalk and/or tree well <br />areas, remove sucker growth on parkway trees, trim vines along <br />walls so as not to allow plant material to impede pedestrian traffic <br />or grown onto sidewalk areas, and remove any debris and trash <br />daily. Contractor shall spray a pre-emergent to discourage future <br />weed growth. <br /> <br />III. SPECIAL MAINTENANCE CONSIDERATIONS <br /> <br />A. The Santa Ana Zoo animal collection will have a variety of individual <br />requirements regarding the maintenance around exhibits and in the vicinity of <br />Zoo animals. Because exhibits change from time to time the Director will notify <br />the Contractor of any specific maintenance requirements associated with any <br />change in animal exhibits. The Contractor agrees to being flexible by changing <br />maintenance practices and/or schedules as a condition of this agreement. <br /> <br />IV. EXTRAORDINARY MAINTENANCE <br /> <br />A. The addition of plant material, or the addition or repair of irrigation system <br />equipment (from valve to water meter) with the exception of irrigation heads and <br />lateral lines may be considered extraordinary maintenance if damage or <br />malfunction is mainly caused by any of the following: <br /> <br />(1) Acts of God <br />(2) Civic Disorder <br />(3) Vehicle Collision <br />(4) Vandals <br />(5) Excavation or re-surfacing of the street <br />(6) Power failures <br />(7) Underground wiring damage <br /> <br />25H-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.