My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC SYSTEMS ELECTRIC 2 - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
PACIFIC SYSTEMS ELECTRIC 2 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:54:22 AM
Creation date
8/26/2008 4:17:29 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC SYSTEMS ELECTRIC
Contract #
N-2008-108
Agency
FINANCE & MANAGEMENT SERVICES
Expiration Date
2/2/2009
Insurance Exp Date
2/2/2009
Destruction Year
2017
Notes
Amended by A-2009-104, -01, -02
Document Relationships
PACIFIC SYSTEMS ELECTRIC 2A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
PACIFIC SYSTEMS ELECTRIC 2B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
PACIFIC SYSTEMS ELECTRIC 2C - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Systems Electric, Inc. <br />38330 Via La Paloma <br />Murrieta California 92583 <br />California State License No. 561275 <br />5?vV%c%wU the PCtvo�Cuwi. IwdwStvU 5%wcC 1989 <br />August 13, 2008 <br />Mr. Mario Ghizzi, <br />CITY OF SANTA ANA <br />Santa Ana, CA <br />ANNUAL VAPOR RECOVERY TESTING <br />To comply with the South Coast Air Quality Management District and the California <br />State Air Resource Board, Pacific Systems Electric a licensed SCAQMD test company <br />will provide Rule 461 Vapor Recovery Testing that is required once a year for the <br />unleaded pump system at each location. PSE shall provide the required testing to <br />include TP201.3, Leak Decay and TP201.4 Back Pressure/Blockage and all other <br />testing required that is specific to each site configuration. Testing will also include new <br />installed Enhanced Vapor Recovery equipment tests. PSE will notify the SCAQMD of <br />test date and email test results to the SCAQMD as required. Copies of test results will <br />be supplied for each location's file. <br />DESIGNATED TANK OWNER / OPERATOR SERVICES <br />PSE will provide monthly inspection services and annual training as Designated <br />Operator for each location per SWRCB regulation. Each location will include the <br />following monthly inspection protocol. Plus, a plan specific to each location will be <br />developed to include additional inspection items at the discretion of PSE to supplement <br />these items: <br />1. PSE will send a letter to the Local Agency that identifies this firm as the <br />designated tank operator for each City Dept UST location and that the UST's are <br />in compliance with all applicable underground storage tank requirements. <br />2. PSE will provide a copy to each location to be kept with the tank log records of a <br />Certificate indicating completion of the California UST System Operator exam. <br />3. PSE will perform monthly visual inspections of all UST systems at each location. <br />Results of inspection shall be recorded in a monthly inspection report form that <br />will include the following items that will be supplemented as indicated above: <br />A. Review alarm history report for the previous month, checking that each <br />alarm condition was documented and responded to appropriately. A copy <br />of the alarm history report or log, along with documentation describing <br />action taken in response to any alarms(s), shall be attached to the monthly <br />visual inspection record. <br />B. Inspect for the presence for hazardous substance, water, or debris in spill <br />containers. <br />951.677.0704 Fax 951.698.5436 888.293.5944 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.