Laserfiche WebLink
<br />' Monitoring and Reporting Procedures <br />' The MMP for the proposed Harbor Medical and Retail Center will be in place through all <br />phases of the project, including the design, construction, and operation phases. The City <br />will be responsible for administering the MMP. Additionally, the City will ensure that all <br />' parties comply with the provisions of the MMP, though the City may delegate monitoring <br />activities to staff, contractors, or consultants. Further, the City will ensure that monitoring <br />is documented using periodic reports and deficiencies are promptly corrected. The <br />designated environmental monitor will track and document compliance with mitigation <br />measures, note any problems that may result, and take appropriate action to rectify the <br />problems. <br />' Mitigation Monitoring Plan Implementation <br />Table 15 lists, by resource area, each mitigation measure included in the IS/MND. <br />' Certain inspections and technical reports may require preparation by qualified individuals <br />and these are specified as needed. The timing and method of verification of each measure <br />is also specified. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />u <br /> <br />71 <br />Initial Study/Mitigated Negative Declaration <br />' Harbor Medical and Retail Center 75A 104 <br />July 2008 <br />